Procurement of main contract regarding construction of heat storage tank

Luk
udbud er afsluttet, du kan ikke besvare invitationen.

I/S Vestforbrænding has decided to improve the availability and flexibility of the district heating system. In this connection, a pressurized heat storage tank (HST) must be installed. This Contract comprises design, manufacture, inspection and testing, etc., of: • A pressurized heat storage tank (approx. 1,625 m3) installed on existing concrete foundation, incl. necessary parts for embedding/fastening the heat storage tank to the concrete foundation. Concrete foundation is an Employer scope of supply. • Insulation of the HST. • Stair tower with platform on the top of the HST for access to inspection openings and operation/maintenance of the HST's valves, sensors and other equipment and components installed on the HST, etc. • CE marking in accordance with applicable directives and regulations as well as installation control. The Contractor must design all components and works in detail (detailed project design).

01-03-2023 12:00:00

45251000-1  Bygge- og anlægsarbejde i forbindelse med kraftværker og varmeværker
51810000-3  Installation af tanke
45213270-6  Bygge- og anlægsarbejder i forbindelse med genbrugsstationer
44600000-6  Tanke, beholdere og containere; radiatorer og kedler til centralvarmeanlæg
45252000-8  Bygge- og anlægsarbejde i forbindelse med spildevandsbehandlingsanlæg, rensningsanlæg og affaldsforbrændingsanlæg


Rambøll Management Consulting A/S
Hannemans alle 53
2300
København S
Danmark

Jacob Roland

Delkontrakter
Procurement of main contract regarding construction of heat storage tank
Yderligere information:
Dokumenter Dokumenter
Luk