I/S Vestforbrænding has decided to improve the availability and flexibility of the district heating system. In this connection, a pressurized heat storage tank (HST) must be installed. This Contract comprises design, manufacture, inspection and testing, etc., of: • A pressurized heat storage tank (approx. 1,625 m3) installed on existing concrete foundation, incl. necessary parts for embedding/fastening the heat storage tank to the concrete foundation. Concrete foundation is an Employer scope of supply. • Insulation of the HST. • Stair tower with platform on the top of the HST for access to inspection openings and operation/maintenance of the HST's valves, sensors and other equipment and components installed on the HST, etc. • CE marking in accordance with applicable directives and regulations as well as installation control. The Contractor must design all components and works in detail (detailed project design).
01-03-2023 12:00:00
45251000-1 Bygge- og anlægsarbejde i forbindelse med kraftværker og varmeværker
51810000-3 Installation af tanke
45213270-6 Bygge- og anlægsarbejder i forbindelse med genbrugsstationer
44600000-6 Tanke, beholdere og containere; radiatorer og kedler til centralvarmeanlæg
45252000-8 Bygge- og anlægsarbejde i forbindelse med spildevandsbehandlingsanlæg, rensningsanlæg og affaldsforbrændingsanlæg
Rambøll Management Consulting A/S
Hannemans alle 53
2300
København S
Danmark
Jacob Roland
Bekendtgørelse | Afsendelsesdato |
---|---|
05. Udbudsbekendtgørelse – forsyningsvirksomhed (TED (v209)) | 27-01-2023 18:13 |
06. Bekendtgørelse om indgåede kontrakter – forsyningsvirksomhed (TED (v209)) | 24-07-2023 09:12 |