I/S Vestforbrænding has decided to improve the availability and flexibility of the district heating system. In this connection, a pressurized heat storage tank (HST) must be installed. This Contract comprises design, manufacture, inspection and testing, etc., of: • A pressurized heat storage tank (approx. 1,625 m3) installed on existing concrete foundation, incl. necessary parts for embedding/fastening the heat storage tank to the concrete foundation. Concrete foundation is an Employer scope of supply. • Insulation of the HST. • Stair tower with platform on the top of the HST for access to inspection openings and operation/maintenance of the HST's valves, sensors and other equipment and components installed on the HST, etc. • CE marking in accordance with applicable directives and regulations as well as installation control. The Contractor must design all components and works in detail (detailed project design).
01-03-2023 12:00:00
45251000-1 Construction works for power plants and heating plants
51810000-3 Installation services of tanks
45213270-6 Construction works for recycling station
44600000-6 Tanks, reservoirs and containers; central-heating radiators and boilers
45252000-8 Construction works for sewage treatment plants, purification plants and refuse incineration plants
Rambøll Management Consulting A/S
Hannemans alle 53
2300
København S
Denmark
Jacob Roland
| Notice | Date of dispatch |
|---|---|
| 05. Contract notice - utilities (TED (v209)) | 27-01-2023 18:13 |
| 06. Contract award notice - utilities (TED (v209)) | 24-07-2023 09:12 |