The Scope of work for COBRAcable VSC Converter includes design, execution and completion of the following: — HVDC-VSC Converter substation in Eemshaven, The Netherlands. — HVDC-VSC Converter substation in Endrup, Denmark. The transfer capability for the COBRAcable VSC Converter Plant shall be 700 MW at +/- 320kV DC with reference to IEC TR 62543:2013 Ed. 1.1 High- voltage direct current (HVDC) power transmission using voltage sourced converters (VSC)
30-12-2014 10:00:00
31121110-4 Effektomformere
31200000-8 Elektriske fordelings- og styreapparater
45315300-1 Strømforsyningsinstallationer
50532000-3 Reparation og vedligeholdelse af elektriske maskiner, apparater og tilhørende udstyr
51120000-9 Installation af mekanisk udstyr
Energinet
Tonne Kjærsvej 65
7000
Fredericia
Danmark
Vis profil
Kirsten Ebstrup
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
| Bekendtgørelse | Afsendelsesdato |
|---|---|
| Offentliggør på branded site (Kundeside (EU-Supply ekstern side)) | 10-12-2014 21:10 |
| Udbudsbekendtgørelse – forsyningsvirksomhed (TED (v208)) | 11-12-2014 11:10 |
Bekendtgørelse om supplerende oplysninger, uafsluttet procedure eller berigtigelse (TED (v208))
|
11-12-2014 11:10 |