15/03059 - Gravity Based Sub-Structures for KFA and KFBE Offshore Substations (OSS)

The RFT has ended, you cannot answer the invitation.
RFT is cancelled
The RFT is cancelled by authority. It is not possible to submit response on this RFT.

The scope of work includes in particular: Detailed Engineering, Procurement, Construction and offshore Installation based on Employers basic design and general specifications of 2 gravity based substructures (GBS). The substructures are to be used as foundations for the 3 AC offshore substation topsides (KFA, KFB and KFE) for two projects called Kriegers Flak AC and Kriegers Flak Combined Grid Solution (CGS). Fabrication and Transportation of substructures to the offshore construction site, preparation of seabed, placement of the substructures, preparing of scour protection, all other relevant works for fabrication, transport and offshore installation The expected time for execution of the contract Q3 2016 – Q1 2018, subject to change of time schedule. Related services

13-01-2016 12:00:00

45262424-9  Offshore-module fabrication work
45000000-7  Construction work
76520000-4  Offshore services


Energinet
Tonne Kjærsvej 65
7000
Fredericia
Denmark
View profile

Eva Damsted Juhler
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET

Packages
Gravity Based Sub-Structures for KFA and KFBE Offshore Substations (OSS)
Additional information:
Documents Documents
Close