Kriegers Flak CGS (Combined Grid Solution) is a joint project between Energinet.dk and 50Hertz Transmission to interconnect the Danish and German grid via the two offshore wind farms at Krieger’s Flak (DK) and Baltic 2 (DE). The Contracting Entity wants to procure Burial and Protection of approximately 2 x 24 km of submarine cable route, which is to be divided into trenching and jetting work for the Krieger’s Flak CGS connection. The works includes inter alia: 1. Boulder Removal 2. Pre-trenching/trenching 3. Jetting 4. Covering the Trench 5. Surveys and Documentation
29-12-2016 12:00:00
45314310-7 Kabellægningsarbejder
76520000-4 Offshoreaktiviteter
60630000-3 Kabellægning med kabelskibe
43316000-1 Maskiner til kabelnedlægning
71354500-9 Maritim opmåling
Energinet
Tonne Kjærsvej 65
7000
Fredericia
Danmark
Vis profil
Eva Damsted Juhler
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
| Bekendtgørelse | Afsendelsesdato |
|---|---|
| 05. Udbudsbekendtgørelse – forsyningsvirksomhed (TED (v209)) | 08-12-2016 14:40 |
| 06. Bekendtgørelse om indgåede kontrakter – forsyningsvirksomhed (TED (v209)) | 03-10-2017 11:10 |
Since the ESPD is an XML file, it is not possible to open it and read like and Word or Excel file. The XML file has to be uploaded to the European Commission’s ESPD database for it to be opened and filled out. Please follow the guideline located in the folder "01 Prequalification material" after log-in into EU-Supply. In the prequalification phase the tender material is for your information only.
Get access to the documents: If your company is not registered in EU-Supply, please register via the online registration, top left in this window. Then log-in to EU-Supply to get access to the tender material and the “Supplier question and answer” and “Message” feature, and to have the possibility to submit your material. It is free to register as a user in the system, and once the company is registered the company profile can be re- used for future tenders in EU-Supply.