The Contracting Authority wants to purchase offshore pipeline certification of the EPII branch pipeline, the Lillebælt Pipeline and PLEM (Pipeline End Manifold), for the Baltic Pipe Project. The certification must include verification in all phases from design through manufacturing, installation and commissioning in compliance with DNVGL-ST-F101/DNV-OS-F101-and DNVGL-SE-0475/DNV-OSS-301. Based on this the Baltic Pipe project must obtain an unconditional certificate of conformity for the pipelines and PLEM, which will be the responsibility of the appointed Certification Body. The unconditional certificate of conformity is a requirement for project as the Danish Energy Agency (Energistyrelsen) requires this prior to issuing a commissioning permit. Further details can be found in the tender documents, cf. Scope of Work (18/01985-1) Section 1.
17-09-2018 12:00:00
71631000-0 Teknisk inspektion
Energinet
Tonne Kjærsvej 65
7000
Fredericia
Danmark
Vis profil
Helle Barløse
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
| Bekendtgørelse | Afsendelsesdato |
|---|---|
| 05. Udbudsbekendtgørelse – forsyningsvirksomhed (TED (v209)) | 31-08-2018 12:10 |
| 06. Bekendtgørelse om indgåede kontrakter – forsyningsvirksomhed (TED (v209)) | 03-01-2019 14:11 |