19/03036 - Framework agreement concerning BMR-stations

The RFT has ended, you cannot answer the invitation.

The framework agreement concerns purchase of BMR-stations (Biogas Measuring & Regulating Stations). The stations are to be used for the injection of biogas into the 4 barg natural gas net or the 7 barg natural gas grid. The framework agreement contains three types of BMR-stations with flow rates of 1.500, 4.000 and 6.000 Nm³/h. The Supplier’s scope of supply includes engineering, manufacturing, installation, testing and commissioning. Some parts which are to be installed by the Supplier in the BMR-stations are supplied by the Contracting authority – it concerns the following parts: Flow computer, Client Interface PLC, Router/Modem/ADSL. The Contracting authority supplies and installs the following parts of the BMR-stations: Analyzing Unit, PC/Workstation and Turbine Meter. All other parts of the BMR-stations are to be delivered and installed by the Supplier.

24-04-2019 14:00:00

39340000-7  Gas network equipment
39341000-4  Gas pressure equipment
44211000-2  Prefabricated buildings
44211100-3  Modular and portable buildings


Energinet
Tonne Kjærsvej 65
7000
Fredericia
Denmark
View profile

Kirsten Ebstrup
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET

Published notices
05. Contract notice - utilities (TED (v209)) 08-04-2019 18:26
06. Contract award notice - utilities (TED (v209)) 23-10-2019 14:10
Packages
Framework agreement concerning BMR-stations
Additional information:
Documents Documents
Close