The framework agreement concerns purchase of BMR-stations (Biogas Measuring & Regulating Stations). The stations are to be used for the injection of biogas into the 4 barg natural gas net or the 7 barg natural gas grid. The framework agreement contains three types of BMR-stations with flow rates of 1.500, 4.000 and 6.000 Nm³/h. The Supplier’s scope of supply includes engineering, manufacturing, installation, testing and commissioning. Some parts which are to be installed by the Supplier in the BMR-stations are supplied by the Contracting authority – it concerns the following parts: Flow computer, Client Interface PLC, Router/Modem/ADSL. The Contracting authority supplies and installs the following parts of the BMR-stations: Analyzing Unit, PC/Workstation and Turbine Meter. All other parts of the BMR-stations are to be delivered and installed by the Supplier.
24-04-2019 14:00:00
39340000-7 Udstyr til gasnet
39341000-4 Gastryksudstyr
44211000-2 Præfabrikerede bygninger
44211100-3 Modulopbyggede og transportable bygninger
Energinet
Tonne Kjærsvej 65
7000
Fredericia
Danmark
Vis profil
Kirsten Ebstrup
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
| Bekendtgørelse | Afsendelsesdato |
|---|---|
| 05. Udbudsbekendtgørelse – forsyningsvirksomhed (TED (v209)) | 08-04-2019 18:26 |
| 06. Bekendtgørelse om indgåede kontrakter – forsyningsvirksomhed (TED (v209)) | 23-10-2019 14:10 |