All activities required to complete the Work in accordance with the Contract necessary for tie-in operations in connecting the new constructed onshore pipelines both between the individual construction parts and connection to the existing transmission system are separated in different types of tie-in: In particular this includes, but is not limited to, the following: · Tie-in to the existing system being in operation. This means that a separation typically consists of one valve. Energinet will here check the tightness of the valve before the operation is carried out. · Tie-in to the existing system in operation but separated with two valves and nitrogen filling between the two valves. · Tie-in between two newly constructed sections with no connection to gas system in operation. Here the sections may be delivered with a slight overpressure of nitrogen or dry air. This is subject for check before the tie-in operation starts.
08-02-2021 12:00:00
45000000-7 Construction work
45111291-4 Site-development work
45231200-7 Construction work for oil and gas pipelines
45262680-1 Welding
Energinet
Tonne Kjærsvej 65
7000
Fredericia
Denmark
View profile
Rikke Sadolin
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
Notice | Date of dispatch |
---|---|
05. Contract notice - utilities (TED (v209)) | 12-01-2021 15:41 |
06. Contract award notice - utilities (TED (v209)) | 10-02-2021 15:11 |