20/08229 - ANNULLERET - Baltic Pipe Onshore - Works for Tie-ins

The RFT has ended, you cannot answer the invitation.

All activities required to complete the Work in accordance with the Contract necessary for tie-in operations in connecting the new constructed onshore pipelines both between the individual construction parts and connection to the existing transmission system are separated in different types of tie-in: In particular this includes, but is not limited to, the following: · Tie-in to the existing system being in operation. This means that a separation typically consists of one valve. Energinet will here check the tightness of the valve before the operation is carried out. · Tie-in to the existing system in operation but separated with two valves and nitrogen filling between the two valves. · Tie-in between two newly constructed sections with no connection to gas system in operation. Here the sections may be delivered with a slight overpressure of nitrogen or dry air. This is subject for check before the tie-in operation starts.

08-02-2021 12:00:00

45000000-7  Construction work
45111291-4  Site-development work
45231200-7  Construction work for oil and gas pipelines
45262680-1  Welding


Energinet
Tonne Kjærsvej 65
7000
Fredericia
Denmark
View profile

Rikke Sadolin
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET

Published notices
05. Contract notice - utilities (TED (v209)) 12-01-2021 15:41
06. Contract award notice - utilities (TED (v209)) 10-02-2021 15:11
Packages
Baltic Pipe Tie In
Additional information: