All activities required to complete the Work in accordance with the Contract necessary for tie-in operations in connecting the new constructed onshore pipelines both between the individual construction parts and connection to the existing transmission system are separated in different types of tie-in: In particular this includes, but is not limited to, the following: • Tie-in to the existing system being in operation. This means that a separation typically consists of one valve. Energinet will here check the tightness of the valve before the operation is carried out. • Tie-in to the existing system in operation but separated with two valves and nitrogen filling between the two valves. • Tie-in between two newly constructed sections with no connection to gas system in operation. Here the sections may be delivered with a slight overpressure of nitrogen or dry air. This is subject for check before the tie-in operation starts.
10-03-2021 12:00:00
45000000-7 Construction work
Energinet
Tonne Kjærsvej 65
7000
Fredericia
Denmark
View profile
Rikke Sadolin
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
Notice | Date of dispatch |
---|---|
05. Contract notice - utilities (TED (v209)) | 19-02-2021 14:40 |
06. Contract award notice - utilities (TED (v209)) | 28-05-2021 12:11 |