The Danish government has decided to build a new highspeed electrified railway on West Funen. The new railway track shall be in a ‘transport corridor’ and will be build alongside the existing motorway E20 between Middelfart and Odense. The existing gas transmission line is in that corridor hence the pipeline must be re-routed North of the corridor. The decommissioned pipeline and stations will be removed by another contractor. The scope of work comprises the following main activities. 1) Design and construction of approximately 26 km new 30” 80 bar Gas Transmission Pipeline. 2) Design and construction of 3 new Line Valve Stations. 3) Design and construction of cable duct and fibre optical cable along 26 km pipeline, including inspection wells for each 5 km. 4) Design and construction of approximately 400 m new 30” 80 bar Gas Transmission Pipeline at Blommenslyst. 5) Tie-in of the new pipeline sections to the existing Gas Transmission System at 4 locations (TP1-2-3-4). For further details concerning the scope of work the Contracting Authority refers to General Requirements (doc.21/08999-02) and Design report (doc. 21/08999-01). The languages of this tender are Danish and English. All tender documents are available in English, however the authentical version of the Design report is the Danish version.
22-04-2022 12:00:00
45231000-5 Construction work for pipelines, communication and power lines
Energinet
Tonne Kjærsvej 65
7000
Fredericia
Denmark
View profile
Anja Lorenzen
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
Notice | Date of dispatch |
---|---|
05. Contract notice - utilities (TED (v209)) | 28-03-2022 17:11 |
06. Contract award notice - utilities (TED (v209)) | 12-01-2023 11:42 |