22/09963 - Procurement of Welding of Production pipe and Demagnetization

The RFT has ended, you cannot answer the invitation.

The scope of delivery is comprised of: • During removal of the 9 ⅝" (43.5 lb/ft) production string, separate the pipes • Prepare the used 9 ⅝" (43.5 lb/ft) pipe ends with weld seam according to API 5L • Demagnetize pipes for welding • Detailed description of the planned procedure for cutting, prepare and demagnetization of the used pipes • Welding of all connections within 9 ⅝" (43.5 lb/ft) gas production string; depth approx. 1,000 m • All welded pipe connections have to be examined 100% with ultrasonic and x-ray tests. • All C-rings have to be examined 100 % NDT (Magnetic). • The contractor has to deliver a detailed description of the welding procedure of pipes (heat treatment, etc.) and the certificates of the welders prior to starting the work. • A welding supervisor has to be available on site in accordance with DIN EN ISO 14731 (weld-ing coordination - task and responsibilities). • A welding test for the casing including the corresponding destructive examinations has to be performed.

15-06-2023 12:00:00

71550000-8  Blacksmith services


Energinet
Tonne Kjærsvej 65
7000
Fredericia
Denmark
View profile

Anja Lorenzen
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET

Published notices
05. Contract notice - utilities (TED (v209)) 30-05-2023 21:42
Contract or concession award notice – standard regime (eForm) 21-06-2024 14:01 Original notice publication
Packages
Procurement of Welding of Production pipe and Demagnetization
Additional information:
Documents Documents