The scope of delivery is comprised of: • During removal of the 9 ⅝" (43.5 lb/ft) production string, separate the pipes • Prepare the used 9 ⅝" (43.5 lb/ft) pipe ends with weld seam according to API 5L • Demagnetize pipes for welding • Detailed description of the planned procedure for cutting, prepare and demagnetization of the used pipes • Welding of all connections within 9 ⅝" (43.5 lb/ft) gas production string; depth approx. 1,000 m • All welded pipe connections have to be examined 100% with ultrasonic and x-ray tests. • All C-rings have to be examined 100 % NDT (Magnetic). • The contractor has to deliver a detailed description of the welding procedure of pipes (heat treatment, etc.) and the certificates of the welders prior to starting the work. • A welding supervisor has to be available on site in accordance with DIN EN ISO 14731 (weld-ing coordination - task and responsibilities). • A welding test for the casing including the corresponding destructive examinations has to be performed.
15-06-2023 12:00:00
71550000-8 Smedearbejder
Energinet
Tonne Kjærsvej 65
7000
Fredericia
Danmark
Vis profil
Anja Lorenzen
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
Bekendtgørelse | Afsendelsesdato | |
---|---|---|
05. Udbudsbekendtgørelse – forsyningsvirksomhed (TED (v209)) | 30-05-2023 21:42 | |
Bekendtgørelse om indgåede kontrakter eller koncessionstildeling – standardordningen (eForm) | 21-06-2024 14:01 | Oprindelig bekendtgørelsespublikation |