BB2 - Steam Turbine Unit

The RFT has ended, you cannot answer the invitation.

Fjernvarme Fyn Produktion A/S (hereafter Fjernvarme Fyn) is located in Odense, Denmark and has initiated a procurement procedure concerns the award of a contract for a new steam turbine unit. The award of the contract requires Tenderers, who can be responsible for a complete project execution (including deliveries of components) for the new steam turbine unit, including the following main supplies: • Engineering, design and QA • Delivery of a back pressure steam turbine designed for district heating • Gear if needed • Generator 10 kV • District heating turbine condenser • Auxiliary systems for the above • Control system • Electrical installations • Erection of the above • Commissioning of the unit, including test runs • Supply of new spare parts. Further details for the scope of supply can be seen in section 3 of the Special Conditions. It is a requirement for the Supplier to have access to workshops for manufactory activities and an experienced back office for engineering and design. This applies to both basic Scope of Supply (as stated in section 3 of the Special Conditions) and options (as stated in section 4 of the Special Conditions). It is important that the tenderer is aware that long transportation time constitutes a significant risk to the time schedule.

25-10-2021 14:00:00

42112100-8  Steam turbines
42112000-7  Turbine installations


Fjernvarme Fyn
Havnegade 120
5000
Odense C
Denmark

Maria Ahern
https://www.fjernvarmefyn.dk/

Published notices
05. Contract notice - utilities (TED (v209)) 07-10-2021 09:10
Packages
BB2 - Steam Turbine Unit
Additional information:
Documents Documents
Close