Fehmarnbelt Fixed Link Project: Tunnel Electrical and Mechanical Contract

The RFT has ended, you cannot answer the invitation.

The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor betweenScandinavia and continental Europe. This is intended to be an immersed tunnel containing two dualcarriageways and a twin-track railway. It will traverse the 19 km distance across the Fehmarnbelt betweenRødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S requires design, procurement and building/installation of a Mechanical, Electrical, Instrumentation,Control and Automation system for the tunnel that delivers a high level of reliability, availability, maintainabilityand safety. The objective of the tunnel MEICA System is to enable Femern A/S to efficiently manage theoperation, maintenance, safety and security of the tunnel through an integrated set of electrical and mechanicalsystems.

30-09-2020 00:00:00

45310000-3  Electrical installation work
31625100-4  Fire-detection systems
31682210-5  Instrumentation and control equipment
31682510-8  Emergency power systems
32000000-3  Radio, television, communication, telecommunication and related equipment
34993100-5  Tunnel lighting
35111500-0  Fire suppression system
42961200-2  Scada or equivalent system
45223100-7  Assembly of metal structures
45311000-0  Electrical wiring and fitting work
45312300-0  Antenna installation work
45350000-5  Mechanical installations
48000000-8  Software package and information systems
50000000-5  Repair and maintenance services
71541000-2  Construction project management services


Femern Bælt A/S
Vester Søgade 10
1601
København V
Denmark

Femern - Jimmie Bøllingtoft

Published notices
01. Prior information notice (TED (v209)) 14-07-2020 13:56
Packages
Fehmarnbelt Fixed Link Project: Tunnel Electrical and Mechanical Contract
Additional information:
Documents Documents
RFT mailing address:
Vester Søgade 10
1601
København V
Denmark
Close