This contract includes the delivery of a DS/IEC/IEEE 80005 compliant Shore Power System (SPS) in the Port of Aar-hus, Denmark. The SPS supply one ship at a time at a specific berth at Polensgade, Aarhus C. The cruise ship terminal in question can accept ships with a size of up to approx. 300 m LOA. The contract includes: converter station, Medium voltage underground cabling between SPS and connection boxes, mobile cable management device, training of personel etc., see furthermore section II.2.4.
11-01-2021 12:00:00
31200000-8 Elektriske fordelings- og styreapparater
45315300-1 Strømforsyningsinstallationer
45255420-9 Værkstedsarbejder i land
45311000-0 Installation af el-ledninger og el-armaturer
71323100-9 Projektering i forbindelse med elforsyningssystemer
45317200-4 Elinstallation til transformere
31682540-7 Udstyr til understation
51111300-6 Installation af transformere
45311200-2 Installation af elarmaturer
51112000-0 Installation af udstyr til distribution og overvågning af elektricitet
51110000-6 Installation af elektrisk udstyr
Port of Aarhus
Vandvejen 7
8000
Aarhus C
Danmark
KAPS - Cecilie Hansen
| Bekendtgørelse | Afsendelsesdato |
|---|---|
| 05. Udbudsbekendtgørelse – forsyningsvirksomhed (TED (v209)) | 09-12-2020 16:26 |
| 06. Bekendtgørelse om indgåede kontrakter – forsyningsvirksomhed (TED (v209)) | 03-12-2021 12:40 |