Dnr 2016/44 - Fuel handling system

upphandlingen är avslutad, du kan inte besvara inbjudan.

Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 – 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 – 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/44) relates to the purchase of a fuel handling system to supply the boiler with solid fuel. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.

2016-11-08 23:59:59

42164000-6  Hjälpapparater för användning tillsammans med ånggeneratorer


Mälarenergi AB
Box 14
721 03
Västerås
Sverige

Amil Misic
http://www.malarenergi.se

Delkontrakt
Fuel handling system
Instruktioner till budgivare att synas på upphandlingarna:

Upphandlande enhet är Mälarenergi AB med organisationsnummer 556448-9150. Vänligen notera att upphandlingen genomförs i det elektroniska upphandlingssystemet CTM

Ytterligare information:
Dokument Dokument
Upphandlingens mailing adress:
Box 14
721 03
Västerås
Sverige
Stäng