| Document available to download | Size (kB) |
| Other documents (Available after expression of interest) |
| Additional Information regarding question 11 in the proposal form.docx |
| A copy of the CAR/primary TPL insurance policy for the project |
| Contract AB 92.pdf |
| Contract ABR 89.pdf |
| Contract ABT 93.pdf |
| E1001 Track Works - Contract Terms 5.0 (3).pdf |
| E3001 Road Bridges Lolland-Falster Contract Terms in UK, Final .pdf |
| E8001 Stations - Contract terms (3).pdf |
| Electrification Programme - Contract.pdf |
| Electrification Programme ABT 93 inc Additions and Deviations Appendix 1.pdf |
| Electrification Programme Appendix c - Amendments to ABR 89 (8034166_1).docx |
| ESPD-Request_Femern PI.xml |
| Femern Single Project PI Design and Build Insurance wording.doc |
| Femern SPPI Proposal Form signed 30th November 2017.pdf |
| Presentation from UW Meeting in London 2 |
| Presentation from UW meeting in London 3 |
| I7101 Electrification program contract where Cowi-Systra perform the design.pdf |
| PI - Femern - Insurer Presentation Document 1 December 2017.pdf |
| Summary of Q&A session, UW Meeting in London, 16 Jan 2018 |
| Presentation from UW Meeting in London 1 |
| Tender description - Professional Indemnity .pdf |