| Document available to download | Size (kB) |
| Other documents (Available after expression of interest) |
| Appendix T2 Price list.docx |
| Appendix T2 Price list.pdf |
| Appendix T3 Statement from consortia.docx |
| Appendix T4 Statement of support.docx |
| Appendix T5 Bank declaration.docx |
| Appendix T6 Reservations.docx |
| Appendix T7 Statement of conformity.docx |
| Appendix T8 - Vejledning til ESPD på engelsk.pdf |
| Contract notice published 16-01-2018-en.pdf |
| D1 Ground floor plan with measures.pdf |
| D10 Stairs, Ladders and Platforms.pdf |
| D2 Conceptual site plan.pdf |
| D3 Main Switchboard Patch location.pdf |
| D4 1st floor plan visitors bridge.pdf |
| D5 Longitudinal Section.pdf |
| D6 Cross section with visitors bridge.pdf |
| D7 Conceptual Layout.pdf |
| D8 Flow Chart.pdf |
| D9 Capacity Diagram.pdf |
| Part 0.a Index.pdf |
| Part 0.b Introduction.pdf |
| Part 0.c Checklist for Tender - revised 2018.03.09.docx |
| Part 0.c Checklist for Tender - revised 2018.03.09.pdf |
| Part 0.c Checklist for Tender.docx |
| Part 0.c Checklist for Tender.pdf |
| Part I.b Tender Conditions with published contract notice.pdf |
| Part I.b Tender Conditions.pdf |
| Part III Contract.pdf |
| Part III.a General Conditions.pdf |
| Part III.b Definitions.pdf |
| Part III.c code of conduct .pdf |
| Part III.d Prices and Payment Conditions.pdf |
| Part III.e Contract Time Schedule.pdf |
| Part III.f Economic Securities.docx |
| Part III.f Economic Securities.pdf |
| Part IV App A1 Technical Specification.pdf |
| Part IV App A2 CMS and Instrumentation.pdf |
| Part IV App A3 Electrical equipment.pdf |
| Part IV App A4 General Technical Requirements.pdf |
| Part IV App A5 Commissioning and testing.pdf |
| Part IV App A6 Guarantee Requirements.pdf |
| Part IV App B1 Site and Working Conditions.pdf |
| Part IV App B2 HSE and QA.pdf |
| Part IV App C1 Project data.pdf |
| Part IV App C2 CMS concept principle.pdf |
| Part IV App C3 main powersupply principle.pdf |