Document available to download | Koko (kB) |
Other documents (Available after expression of interest) |
0.0 - Tender Conditions - Compressors.pdf |
0.1 - Guide to Prequalification and ESPD.pdf |
1.0 - Contract Agreement - Service and Maintenance.pdf |
1.1 - Clarification and Reservations List - Service and Maintenance.pdf |
1.1 - Clarification and Reservations List - Service and Maintenance.XLSX |
1.2 - Employers Requirements - Service and Maintenance.pdf |
1.3 - Price Schedule - Service and Maintenance Agreement.pdf |
1.3 - Price Schedule - Service and Maintenance Agreement.XLSX |
2.0 - Contract Agreement - Compressors.pdf |
2.1 - Clarification and Reservations List - Compressors.pdf |
2.1 - Clarification and Reservations List - Compressors.XLSX |
2.2 - Particular Conditions - Compressors.docx |
2.2 - Particular Conditions - Compressors.pdf |
2.3 - Appendix to Tender, incl Letter of Tender.docx |
2.3 - Appendix to Tender, incl Letter of Tender.pdf |
2.4 - General Conditions - Compressors (Yellow FIDIC).PDF |
2.5 - Employer Requirements - Compressors.pdf |
2.6 - Technical Requirements - Compressors.pdf |
2.7 - Price and Payment Schedule - Compressor Units.pdf |
2.7 - Price and Payment Schedule - Compressor Units.xlsx |
2.8 - Appendix 1 - Notes on Pricing.pdf |
2018-OJS128-292741-en Baltic Pipe gas compressors for compressor station Everdrup_18-01274_187047.pdf |
29-000-CB-0801 - Surface Treatment, Protection against Corrosion.pdf |
29-000-CB-0803 - Supply and Erection of Steel Structures.pdf |
29-000-EB-0802 - Cabling and Cables Ways.pdf |
29-000-EB-0803 - Low Voltage Switch Gear and Control Gear Assemblies.pdf |
29-000-EB-0805 - Earthing and Bonding.pdf |
29-000-GB-0022 - Mechanical Completion an Pre-commissioning Work, Gas.pdf |
29-000-GB-0023 - QHSE System Requirements to Vendors.pdf |
29-000-GB-0810 - Technical Drawings and Documents.pdf |
29-000-GB-0812 - As-built and Users File.pdf |
29-000-GB-5008 - SAP Documentation - Creation of new Technical locations and Equipment.pdf |
29-000-GH-5072 - Engineering Manual.pdf |
29-000-IB-0802 - Field Instruments.pdf |
29-000-IB-0803 - Instrumentation Installation.pdf |
29-000-PB-0801 - Ball Valves DN 50 mm.pdf |
29-000-PB-0802 - Valves DN 40 mm.pdf |
29-000-PB-0803 - WedgesType Gate Valves DN 50 mm (Throttling).pdf |
29-000-PB-0804 - Conduit Type Gate Valves DN 50 mm (Shut-off).pdf |
29-000-PB-0805 - Plug Valves DN 50 mm.pdf |
29-000-PB-0806 - Manual Valve Operators.pdf |
29-000-PB-0810 - Filters and Separators.pdf |
29-000-PB-0811 - Air-cooled Heat Exchangers.pdf |
29-000-PB-0814 - Control Valves.pdf |
29-000-PB-0815 - Safety Relief Valves.pdf |
29-000-PB-0816 - Check Valves DN 50 mm.pdf |
29-000-PB-0818 - Valve Actuators.pdf |
29-000-RB-0810 - Flanges.pdf |
29-000-RB-0816 - Stud Bolts and Nuts.pdf |
29-000-RB-0819 - Gaskets.pdf |
29-000-RB-0830 - Welding Inspection - Steel Pipes.pdf |
29-000-RB-0844 - Thermal and Acoustic Insulation.pdf |
29-000-RB-0845 - Pressure Test in Plants.pdf |
29-000-RB-0847 - Steel Pipes for Piping in Plants -2.pdf |
Attachment 01 - Site Plan.PDF |
Attachment 02 - Hazardous Area Classification.PDF |
Attachment 03 Performance Data Sheets.pdf |
Attachment 03 Performance Data Sheets.xlsx |
Attachment 04 - Dry Gas Seal Data Sheets.DOCX |
Attachment 04 - Dry Gas Seal Data Sheets.pdf |
Attachment 05 - Utilities Con List Design Data Sheet.PDF |
Attachment 05 - Utilities Con List Design Data Sheet.XLSX |
Attachment 06 - Electrical Load List.PDF |
Attachment 06 - Electrical Load List.XLSX |
Attachment 08 - Mechnical interfaces.PDF |
Attachment 09 - Document List.PDF |
Attachment 10 - Norm, codes and standards.PDF |
Attachment 11 - PFD.PDF |
Attachment 12 - Design Data Book.PDF |
Attachment 13 - 29-000-GH-5072_Engineering Manual.PDF |
Attachment 14 - Electrical_interfaces.PDF |
Attachment 15 - Noise study calculation report.PDF |
espd-request Baltic Pipe - Procurement of gas compressors for compressor station Everdrup 187047_18-01274.xml |