Dokument zum Download verfügbar | Taille (kB) |
Andere Dokumente (Verfügbar nach Interessensbekundung) |
Appendix 1.a - General Technical Specification.pdf |
Appendix 1.b.1 06HDA Slag Handling System Drawing.PDF |
Appendix 1.b.2 06HDA PID Slag Handling System.PDF |
Appendix 1.b.3 06HDA and HHC PID Grate Hydraulic System Drives.pdf |
Appendix 1.b.4 06 Steel Layout Drawings.pdf |
Appendix 1.c - Access possibilities.pdf |
Appendix 1.d - Scope and Limits of Supply List.pdf |
Appendix 1.g – GTB02 - Mounting, testing and commissioning.pdf |
Appendix 1.h – GTB07 – Galleries and Stairs.pdf |
Appendix 1.i – GTB10 - Documentation.pdf |
Appendix 1.j - GTB13 - Insulation and cladding.pdf |
Appendix 1.k - GTB14 - Surface treatment of steel constructions.pdf |
Appendix 1.l - GTB15 - Pipes, pipe hangers, fittings, pumps.pdf |
Appendix 1.m - GTB19 - Marking of system components.pdf |
Appendix 1.n - Vestforbrænding layout drawing.pdf |
Appendix 13, PSS.docx |
Appendix 14, Vestforbraending-persondatapolitik-2020.pdf |
Appendix 1aa, Corrections to appendix 1 (Technical specifications).pdf |
Appendix 2, CSR - leverandørklausul.pdf |
Appendix 3, Occupational health, safty and environment in relation to work for Vestforbrænding.pdf |
Appendix 4, Tender list (26.11.2021).xlsx |
Appendix 4, Tender list (29.10.2021).xlsx |
Appendix 6, Støtteerklæring - finansiel.docx |
Appendix 7, Støtteerklæring - teknisk.docx |
Appendix 8, AB-ME18.pdf |
Appendix 9, Standard Conditions 17th of August 2021.pdf |
Appendix A, CV template.docx |
Contract (29.10.2021).pdf |
Tender Requirements (26.11.2021).pdf |
Tender Requirements (29.10.2021).pdf |