| Dokumenter som er mulig at nedlaste | Størrelse (kB) |
| Andre dokumenter (Tilgjenglig etter å ha meldt interesse) |
| 2022-OJS098-272162 - Contraact notice re 298666 - 2201941 - GGLF Construction contract Onshore Pipeline – Energinet p .pdf |
| 21_07053-5 CP2 Special measrement post.pdf |
| 22_03791-1 Detailed tender document list – GGLF onshore construction contract Revision B.pdf |
| 22_03864-1 Particular Spedification Revision A .PDF |
| 22_03864-2 constructon programme and penalty plan Revision B.pdf |
| 22_03864-2 constructon programme and penalty plan Revision B.pdf |
| 22_03864-24 Assessment report on soil and groundwater issues Revision A.pdf |
| 22_03864-25 Soil investigations, factual report Revison A.PDF |
| 22_03864-26 Geophysical investigations, factual report Revision A.PDF |
| 22_03864-30 Document Management Requirements Revison A.PDF |
| 22_03864-31 GGLF Health and Safety Plan (HSP) Revision A.PDF |
| 22_03864-32 Energinet Authority Plan Revision A.PDF |
| 22_03865-1 Bill of quantities Revision A .PDF |
| 22_03865-2 Basis for pricing Revision A.pdf |
| 22_03865-3 Payment plan GGLF Revision A.xlsx |
| 23-000-EG-0010.pdf |
| 23-000-EG-0020.pdf |
| 23-000-RD-1004 - Datasheet - Elbow 90 LR DN50_55 bar.pdf |
| 23-000-RD-1005 - Datasheet - Blind Flange (Vent Screw) DN50.pdf |
| 23-000-RD-1006 - Datasheet - Weld Neck Flange DN50_55 bar.pdf |
| 23-000-RD-1007 - Datasheet - Weld Neck Flange DN100_55 bar.pdf |
| 23-000-RD-1012 - Datasheet - Nipoflange DN250 x DN50_55 bar.pdf |
| 23-000-RD-1014 - Datasheet - Monoflange DN25_55 bar.pdf |
| 23-000-RD-1015 - Datasheet - Reducer DN200 x DN100_55 bar.pdf |
| 23-000-RF-1000_01.xltx |
| 23-000-RG-0001.pdf |
| 23-000-RG-0002.pdf |
| 23-000-RG-0003.pdf |
| 23-000-RG-0009.pdf |
| 23-000-RG-0010.pdf |
| 23-000-RG-0011.pdf |
| 23-000-RG-0012.pdf |
| 23-000-RS-0001.pdf |
| 23-000-RS-0002.pdf |
| 23-000-RS-0003.pdf |
| 23-000-RS-0014.pdf |
| 23-000-RS-0022.pdf |
| 23-000-RS-0031.pdf |
| 23-000-RS-0040.pdf |
| 23-000-RS-0041.pdf |
| 23-000-RS-0044.pdf |
| 23-000-RS-0060.pdf |
| 23-000-RS-0064.pdf |
| 23-600-GB-0001 CP1 measruments post list.pdf |
| 23-606-CG-1012_EVERDRUP LV STATION FOUNDATION PLAN.pdf |
| 23-606-CG-1013 EVERDRUP LV STATION AS-BUILT LOCATION OF EXISTING CABLES.pdf |
| 23-606-EF-1001 Cable list Everdrup.pdf |
| 23-606-EG-0002 Everdrup layout el kabler.pdf |
| 23-606-EG-1001_LV STATION EVERDRUP HAZARDOUS AREA CLASSIFICATION PLAN.pdf |
| 23-606-EG-1002_LV STATION EVERDRUP ELECTRICAL EQUIPM AND CABLE ROUTING LAYOUT.pdf |
| 23-606-EG-1003_LV STATION EVERDRUP E & I BLOCK DIAGRAM.pdf |
| 23-606-RD-1011 - Datasheet - Stud Bolts 1 inch.pdf |
| 23-606-RD-1013 - Datasheet - Spiral-wound-gaskets for DN150 RF flange.pdf |
| 23-606-RG-1015_EVERDRUP LV STATION PIPING ISOMETRIC.pdf |
| 23-606-RG-1031_EVERDRUP LV STATION GENERAL LAYOUT (UNIT 03).pdf |
| 23-606-RG-1032_EVERDRUP LV STATION PIPING PLAN (UNIT 03).pdf |
| 23-850-CB-0001_Vejsynsprotokol_Næstved.pdf |
| 23-850-CB-0002_Vejsynsprotokol_Vordingborg.pdf |
| 23-850-CB-0003_Vejsynsprotokol_Guldborgsund.pdf |
| 23-850-CB-0011_Vandsynsprotokol_Næstved.pdf |
| 23-850-CB-0012_Vandsynsprotokol_Vordingborg.pdf |
| 23-850-CB-0013_Vandsynsprotokol_Guldborgsund.pdf |
| 23-850-CB-0020 Energinet GGLF-Teknisk Notat-Drænretablering.pdf |
| 23-850-EG-0003_CP STATION NR ALSLEV E & I BLOCK DIAGRAM.pdf |
| 23-850-EG-0004_CP STATION FARØ E & I BLOCK DIAGRAM.pdf |
| 23-850-EG-0005_CP STATION NR ALSLEV WIC LAYOUT.pdf |
| 23-850-EG-0006_CP STATION FARØ WIC LAYOUT.pdf |
| 23-850-EG-0007_CP STATION NR ALSLEV ELECTRICAL EQUIPM AND CABLE ROUTING LAYOUT.pdf |
| 23-850-EG-0008_CP STATION FARØ ELECTRICAL EQUIPM AND CABLE ROUTING LAYOUT.pdf |
| 23-850-EG-0103.pdf |
| 23-850-EG-0104.pdf |
| 23-850-EG-0105.pdf |
| 23-850-EG-0110.pdf |
| 23-850-EG-0111.pdf |
| 23-850-EG-0112.pdf |
| 23-850-PG-0001 PID.pdf |
| 23-850-RG-0201_ROAD CROSSING, SYDMOTORVEJEN, DRILLING.pdf |
| 23-850-RG-0202_ROAD CROSSING, PRÆSTØ LANDEVEJ, RAMMING.pdf |
| 23-850-RG-0203_ROAD CROSSING, LUNDBYVEJ, DRILLING.pdf |
| 23-850-RG-0204_ROAD AND WATER CROSSING MERTEHØJVEJ, OPEN CUT.pdf |
| 23-850-RG-0205_ROAD CROSSING KØBENHAVNSVEJ, DRILLING.pdf |
| 23-850-RG-0206_ROAD AND WATER CROSSING AMBJERGVEJ, OPEN CUT.pdf |
| 23-850-RG-0207_ROAD AND WATER CROSSING KOHAVEVEJ, OPEN CUT.pdf |
| 23-850-RG-0208_ROAD CROSSING, SYDMOTORVEJEN, DRILLING.pdf |
| 23-850-RG-0209_ROAD CROSSING, SKOVBY TVÆRVEJ, DRILLING HDD.pdf |
| 23-850-RG-0210_ROAD CROSSING, STUBBEKØBINGVEJ, DRILLING.pdf |
| 23-850-RG-0211_ROAD CROSSING, MØNSVEJ, DRILLING.pdf |
| 23-850-RG-0301_WATER COURSE CROSSING, OPEN CUT.pdf |
| 23-850-RG-0306_WATER CROSSING IN FOREST GRAVEL ROAD, OPEN CUT.pdf |
| 23-850-RG-0307_CROSSING OF WATER COURSE BY OPEN CUT.pdf |
| 23-850-RG-0308_CROSSING OF STEEP SLOPE.pdf |
| 23-850-RG-0309_WATER CROSSING, FLADBÆK WATER COURSE, HDD.pdf |
| 23-850-RG-0310_WATER COURSE CROSSING, DRILLING.pdf |
| 23-850-RG-0311_WATER CROSSING, OPEN CUT.pdf |
| 23-850-RG-0313_WATER CROSSING, GUNDSLEV Å, OPEN CUT.pdf |
| 23-850-RG-0314, WATER CROSSING, EVERDRUP, OPEN CUT.pdf |
| 23-850-RG-0318.pdf |
| 23-850-RG-0321.pdf |
| 23-850-RG-0331_Pipe Storage Rynkebjerg.pdf |
| 23-850-RG-0332_Pipe Storage Skovbyvej.pdf |
| 23-850-RG-0350 Crossover.pdf |
| 23-850-RG-0351 Crossing of Baltic Pipe.pdf |
| 23-850-RG-0352 Vent closure DN100.pdf |
| 23-850-RG-0353 Well for Venting arrangement.pdf |
| 23-850-RG-0401_Matrikel 11f, Skovby by, Gundslev_Arealplan.pdf |
| 23-850-RL-0001_Everdrup - Nørre Alslev, Final Alignment - km 0.0 - km 2.0.pdf |
| 23-850-RL-0002_Everdrup - Nørre Alslev, Final Alignment - km 2.0 - km 4.0.pdf |
| 23-850-RL-0003_Everdrup - Nørre Alslev, Final Alignment - km 4.0 - km 6.0.pdf |
| 23-850-RL-0004_Everdrup - Nørre Alslev, Final Alignment - km 6.1 - km 8.0.pdf |
| 23-850-RL-0005_Everdrup - Nørre Alslev, Final Alignment - km 8.0 - km 9.9.pdf |
| 23-850-RL-0006_Everdrup - Nørre Alslev, Final Alignment - km 9.9 - km 11.9.pdf |
| 23-850-RL-0007_Everdrup - Nørre Alslev, Final Alignment - km 11.9 - km 13.9.pdf |
| 23-850-RL-0008_Everdrup - Nørre Alslev, Final Alignment - km 13.9 - km 15.7.pdf |
| 23-850-RL-0009_Everdrup - Nørre Alslev, Final Alignment - km 15.7 - km 17.7.pdf |
| 23-850-RL-0010_Everdrup - Nørre Alslev, Final Alignment - km 17.7 - km 19.5.pdf |
| 23-850-RL-0011_Everdrup - Nørre Alslev, Final Alignment - km 19.5 - km 21.7.pdf |
| 23-850-RL-0012_Everdrup - Nørre Alslev, Final Alignment - km 21.7 - km 23.8.pdf |
| 23-850-RL-0013_Everdrup - Nørre Alslev, Final Alignment - km 23.8 - km 25.8.pdf |
| 23-850-RL-0014_Everdrup - Nørre Alslev, Final Alignment - km 25.8 - km 28.1.pdf |
| 23-850-RL-0015_Everdrup - Nørre Alslev, Final Alignment - km 28.1 - km 30.0.pdf |
| 23-850-RL-0016_Everdrup - Nørre Alslev, Final Alignment - km 30.0 - km 31.8.pdf |
| 23-850-RL-0017_Everdrup - Nørre Alslev, Final Alignment - km 31.8 - km 33.7.pdf |
| 23-850-RL-0018_Everdrup - Nørre Alslev, Final Alignment - km 32.7 - km 34.2.pdf |
| 23-850-RL-0019_Everdrup - Nørre Alslev, Final Alignment - km 36.1- km 37.1.pdf |
| 23-850-RL-0020_Everdrup - Nørre Alslev, Final Alignment - km 39.0 - km 40.5.pdf |
| 23-850-RL-0021_Everdrup - Nørre Alslev, Final Alignment - km 40.5 - km 42.5.pdf |
| 23-850-RL-0022_Everdrup - Nørre Alslev, Final Alignment - km 42.5 - km 44.3.pdf |
| 23-850-RL-0023_Everdrup - Nørre Alslev, Final Alignment - km 44.3 - km 44.8.pdf |
| 23-850-RL-0101-01.pdf |
| 23-850-RL-0101-02.pdf |
| 23-850-RL-0102.pdf |
| 23-850-RL-0103.pdf |
| 23-850-RL-0104.pdf |
| 23-850-RL-0105.pdf |
| 23-850-RL-0106.pdf |
| 23-850-RL-0107.pdf |
| 23-850-RL-0108.pdf |
| 23-850-RL-0109.pdf |
| 23-850-RL-0110.pdf |
| 23-850-RL-0111.pdf |
| 23-850-RL-0112.pdf |
| 23-850-RL-0113.pdf |
| 23-850-RL-0114.pdf |
| 23-850-RL-0115.pdf |
| 23-850-RL-0116.pdf |
| 23-850-RL-0117.pdf |
| 23-850-RL-0118.pdf |
| 23-850-RL-0119.pdf |
| 23-850-RL-0120.pdf |
| 23-850-RL-0121.pdf |
| 23-850-RL-0122.pdf |
| 23-850-RL-0123.pdf |
| 23-850-RL-0124.pdf |
| 23-850-RL-0125.pdf |
| 23-850-RL-0126.pdf |
| 23-850-RL-0127.pdf |
| 23-850-RL-0128.pdf |
| 23-850-RL-0129.pdf |
| 23-850-RR-0002_Final Alignment Report.pdf |
| 23-850-RR-0012 - Pipeline stress report.pdf |
| 23-876-CG-0002_EGESBORG LV STATION FOUNDATION PLAN.pdf |
| 23-876-EG-0001_LV STATION EGESBORG HAZARDOUS AREA CLASSIFICATION PLAN.pdf |
| 23-876-EG-0002_LV STATION EGESBORG ELECTRICAL EQUIPM AND CABLE ROUTING LAYOUT.pdf |
| 23-876-EG-0003_LV STATION EGESBORG E & I BLOCK DIAGRAM.pdf |
| 23-876-EG-0004_LV STATION EGESBORG WIC LAYOUT.pdf |
| 23-876-RG-0005_EGESBORG LV STATION PIPING ISOMETRIC.pdf |
| 23-876-RG-0021_EGESBORG LV STATION GENERAL LAYOUT.pdf |
| 23-876-RG-0022_EGESBORG LV STATION PIPING PLAN.pdf |
| 23-876-RG-0024_EGESBORG LV STATION 3D VIEW.pdf |
| 25-875-CG-0001 Foundation MR station Everdrup.pdf |
| 25-875-UN-0002 Temporary site facilities.pdf |
| 26-606-CG-5125 (3).pdf |
| 26-606-EG-6902 (1).pdf |
| 26-606-EG-6908 (2).pdf |
| 29-000-CB-0801.pdf |
| 29-000-CB-0802.pdf |
| 29-000-CB-0803.pdf |
| 29-000-CB-0814.pdf |
| 29-000-CB-0816.pdf |
| 29-000-CB-0817.pdf |
| 29-000-CG-0100.pdf |
| 29-000-EB-0021.pdf |
| 29-000-EB-0802.pdf |
| 29-000-EB-0803.pdf |
| 29-000-EB-0805.pdf |
| 29-000-EG-0052-01.pdf |
| 29-000-GB-0021.pdf |
| 29-000-GB-0810.pdf |
| 29-000-GB-0811.pdf |
| 29-000-GB-0812.pdf |
| 29-000-GB-5000.pdf |
| 29-000-GB-5008.pdf |
| 29-000-GB-5011.pdf |
| 29-000-GB-5013.pdf |
| 29-000-IB-0802.pdf |
| 29-000-IB-0803.pdf |
| 29-000-IB-5020.pdf |
| 29-000-IB-5021.pdf |
| 29-000-IB-5050.pdf |
| 29-000-PB-0801.pdf |
| 29-000-PB-0802.pdf |
| 29-000-PB-0803.pdf |
| 29-000-PB-0805.pdf |
| 29-000-PB-0806.pdf |
| 29-000-PB-0812.pdf |
| 29-000-PB-0818.pdf |
| 29-000-RB-0803.pdf |
| 29-000-RB-0806.pdf |
| 29-000-RB-0808.pdf |
| 29-000-RB-0810.pdf |
| 29-000-RB-0811.pdf |
| 29-000-RB-0814.pdf |
| 29-000-RB-0816.pdf |
| 29-000-RB-0817.pdf |
| 29-000-RB-0818.pdf |
| 29-000-RB-0819.pdf |
| 29-000-RB-0826.pdf |
| 29-000-RB-0827.pdf |
| 29-000-RB-0829.pdf |
| 29-000-RB-0830.pdf |
| 29-000-RB-0831.pdf |
| 29-000-RB-0832.pdf |
| 29-000-RB-0834.pdf |
| 29-000-RB-0835.pdf |
| 29-000-RB-0836.pdf |
| 29-000-RB-0837.pdf |
| 29-000-RB-0838.pdf |
| 29-000-RB-0839.pdf |
| 29-000-RB-0840.pdf |
| 29-000-RB-0841.pdf |
| 29-000-RB-0842.pdf |
| 29-000-RB-0845.pdf |
| 29-000-RB-0847.pdf |
| 29-000-RB-5001.pdf |
| 29-000-RS-0001.pdf |
| 29-000-RS-0002.pdf |
| 29-000-RS-0003.pdf |
| 29-000-RS-0004.pdf |
| 29-000-RS-0005.pdf |
| 29-000-RS-0006-01.pdf |
| 29-000-RS-0007.pdf |
| A223702-070-001 Technical Note ATEX.pdf |
| A223702-10-TN-001 Width of Working Belt.pdf |
| A223702-10-TN-002 Types of working belts along the alignment.pdf |
| A223702-10-TN-003 - Blow down calculation of main pipeline.pdf |
| A223702-10-TN-004 - Insulating couplings - External force estimation.pdf |
| A223702-10-TN-005 - Crossing utilities.pdf |
| A223702-80-002-Pipeline MTO.pdf |
| A223702-80-003-Station MTO.pdf |
| Appendix 0A + 0B - Clarification list - legal, commercial and technical subjects.xlsx |
| Appendix 1 General Conditions (based on AB 18).pdf |
| Appendix 1B - Letter of commitment - Financial and economic support.pdf |
| Appendix 1B- Letter of commitment, technical and professional support.pdf |
| Appendix A - Labour Clause (to be signed and forwarded together with the tender).pdf |
| Appendix B- Contractor questionnaire about rates of wages and conditions of labour. .pdf |
| Construction Contract - GGLF onshore.pdf |
| Shape-filer.zip |
| Solemn declaration ECR no 833_2014.pdf |
| Tender conditions GGLF Onshore Installation .pdf |