| Document available to download | Size (kB) |
| Other documents (Available after expression of interest) |
| 01 Schedule of Prices - SOP.pdf |
| 01 Schedule of Prices - SOP.xlsm |
| 03 Programme of Works.pdf |
| 05 Amendments - agreed deviations.pdf |
| 06 Scope of Works.pdf |
| 07 Basic Plant Specification.pdf |
| 07A Connection Permit.pdf |
| 07B Wastewater Treatment Plant Raw Data.xlsx |
| 07C Groundwater Raw Data.xlsx |
| 08 Plant Functionality.pdf |
| 09 Process and Plant Specification.pdf |
| 09A Consumption.pdf |
| 09A Consumption.xlsm |
| 09B Spec of Mech. Plant.pdf |
| 09B Spec of Mech. Plant.xlsm |
| 10 Codes, Standards and Regulations.pdf |
| 11 General Mechanical Specifications.pdf |
| 11A GMS Piping.pdf |
| 12 General Electrical and Control System Spec.pdf |
| 13 Documentation.pdf |
| 14 Training and Training Material.pdf |
| 15 Testing.pdf |
| 15A Performance Guarantee.pdf |
| 15A Performance Guarantee.xlsm |
| 16 Site Conditions.pdf |
| 18 Tender Dossier Drawings and Appendices.pdf |
| 19 List of Abbreviations.pdf |
| Alternating.pdf |
| Analog input control.pdf |
| Annex 1.1 - Particular Conditions of Contract.pdf |
| Annex 1.2 - General Conditions of Contract - Yellow FIDIC.pdf |
| Annex 1.3 - Code of Conduct and ESG Principles.pdf |
| Annex 1.4 - Performance Bond.pdf |
| Auma control.pdf |
| Behandling af betonloft.pdf |
| Behandling af gipsvægge.pdf |
| Contract notice.pdf |
| Counter.pdf |
| Declaration of consortium.docx |
| Declaration of consortium.pdf |
| Digital input control.pdf |
| DIN Designmanual for structured cabling.pdf |
| DIN Forsynings O&M (Operation and maintenance) ark.xlsx |
| DIN PUBLISERET - IKT-SPECIFIKATIONER D2023-108370 5.0.pdf |
| DIN QHSE Contract requirements DIN Forsyning.pdf |
| Draft Contract Agreement.pdf |
| Drawing- and documentlist_PWTP&RWTP.pdf |
| Drawing- and documentlist_Underground piping.pdf |
| Endelig geo rapport 23.6895.01. Mådevej 52 6700 Esbjerg.pdf |
| FEED Study - Pure Water Treatment Plant (information only).pdf |
| IDF UPW_K08_C08.08_ARBJord&Belægning_UK.pdf |
| IDF-UPW_K01_C08.02_ARB-Maler-UK.pdf |
| IDF-UPW_K01_C08.02_ARB-Murer-UK.pdf |
| IDF-UPW_K01_C08.02_ARB-Tømrer-UK.pdf |
| IDF-UPW_K01_C08_FarveMaterialeskema.pdf |
| IDF-UPW_K01_C08_SurfaceRoomSchedule.pdf |
| IDF-UPW_K01_T20_H1_E00_S1_N03.pdf |
| IDF-UPW_K01_T20_H1_E01_S1_N02.pdf |
| IDF-UPW_K01_T29_H1_E00_S1_N01.pdf |
| IDF-UPW_K01_T29_H1_E01_S1_N01.pdf |
| IDF-UPW_K01_T29_H1_E02_S1_N02.pdf |
| IDF-UPW_K01_T29_H2_E01_S1_N04.pdf |
| IDF-UPW_K01_T29_H3_E01_S1_N03.pdf |
| IDF-UPW_K01_T35_H1_E02_S1_N03.pdf |
| IDF-UPW_K01_T79_H1_E01_S1_N02.pdf |
| IDF-UPW_K07_C08.02_ARB-EL-UK.pdf |
| IDF-UPW_K07_T60_H01_E00_S1_N03.pdf |
| IDF-UPW_K07_T635_H01_E00_S1_N01.pdf |
| IDF-UPW_K07_T635_H01_E01_S1_N02.pdf |
| IDF-UPW_K08_C08.02_ARB-AfløbJord-UK.pdf |
| IDF-UPW_K08_C08.02_ARB-VVS-Ventilation-UK.pdf |
| IDF-UPW_K08_T501_H01_EAN_S1_N01.pdf |
| IDF-UPW_K08_T57_H01_E00_S1_N01.pdf |
| IDF-UPW_K08_T57_H01_E00_S1_N02.pdf |
| IDF-UPW_K08_T57_H01_E01_S1_N01.pdf |
| IDF-UPW_K08_T57_H06_EUU_S1_N01.pdf |
| IDF-UPW_K08_T57_H06_EUU_S1_N02.pdf |
| IDF-UPW_K08_T57_H06_EUU_S1_N03.pdf |
| IDF-UPW_K08_T59_H01_E00_S1_N01.pdf |
| IDF-UPW_K08_T59_H01_E00_S1_N02.pdf |
| IDF-UPW_K08_T59_H01_E01_S1_N01.pdf |
| IDF-UPW_K08_T59_H01_ERO_S1_N01.pdf |
| IDF-UPW_K09_C05_Main Structural Principles.pdf |
| IDF-UPW_K09_C08.02_ARB-Betonelement-UK.pdf |
| IDF-UPW_K09_C08.02_ARB-Beton-UK.pdf |
| IDF-UPW_K09_C08.02_ARB-Stål-UK.pdf |
| IDF-UPW_K10_T29_H1_ECI_N01_Underground Piping Phase 2 WWTP WEST Plan.pdf |
| IDF-UPW_K10_T90_H1_ECI_N02_Underground_Piping_Pipeline_route.pdf |
| IDF-UPW_K10_T90_H4_ECI_N01_Underground Piping Phase 1 WWTP East Plan.pdf |
| IDF-UPW_K28_C8 - Preliminary fire strategy, Conceptual design-UK.pdf |
| IDF-UPW_K28_T290_H01_E00_S1_N02.pdf |
| IDF-UPW_K28_T290_H01_E01_S1_N02.pdf |
| IDF-UPW_K99_C01_T999_Drawing- and documentlist.pdf |
| IDF-UPW_K99_C08 Construction Project Description_UK.pdf |
| ISA styleguide.pdf |
| Motor control.pdf |
| Notification of the processing of personal data.docx |
| Notification of the processing of personal data.pdf |
| Part 1 OT-Cyber security - Main document.pdf |
| Part 2 OT-Cyber security - Renovation & new operation.pdf |
| Part 3 OT-Cyber security - Additional hardware suppliers to OT.pdf |
| Part 4 OT-Cyber security - Other suppliers with access to OT.pdf |
| PFD-01_PWTP_CIP.pdf |
| PFD-02_PWTP_Pumping Station.pdf |
| PFD-03_PWTP_Influent.pdf |
| PFD-04_PWTP_UF.pdf |
| PFD-05_PWTP_UF Concentrator.pdf |
| PFD-06_PWTP_RO Pre-Treatment.pdf |
| PFD-07_PWTP_RO.pdf |
| PFD-08_PWTP_PW Tank.pdf |
| PFD-10_RWTP_Equalization tank.pdf |
| PFD-11_RWTP_Membrane Bioreactor (MBR).pdf |
| PFD-12_RWTP_Sludge Dewatering.pdf |
| PFD-13_RWTP_GAC adsorption plant.pdf |
| PFD-14_RWTP_GFH adsorption plant.pdf |
| PFD-20_Utilities_Chemical Dosing.pdf |
| PFD-21_Utilities_Pneumatics.pdf |
| PFD-30_Sampling and measurement points.pdf |
| PFD-31_Pure water discharge to WWTP East.pdf |
| PID Control.pdf |
| PLC Startup -Programming Guide.pdf |
| PMD-01_PWTP & RWTP_Process Module Diagram.pdf |
| Programming Design Guide.pdf |
| Rensningsanlæg Øst Mådevej 52 Jordhåndtering_Rambøll 08-02-2024.pdf |
| Reservations.xlsx |
| Solemn declaration - 134a.docx |
| Solemn declaration - 134a.pdf |
| Solmn declaration - Russia.docx |
| Solmn declaration - Russia.pdf |
| Statement of support.docx |
| Statement of support.pdf |
| Tender conditions.pdf |
| Tenderer's identification of risk and cost factors.docx |
| Tenderer's identification of risk and cost factors.pdf |
| Valve control analog.pdf |
| Valve control digital.pdf |
| Valve manuel digital.pdf |
| VSD ABB.pdf |
| VSD Danfoss.pdf |
| Ydervægge base af beton indvendigt.pdf |