Documents - Package 495711:1 - Technical Water Treatment Plant
Document available to downloadSize (kB)
Other documents (Available after expression of interest)
 01 Schedule of Prices - SOP.pdf
 01 Schedule of Prices - SOP.xlsm
 03 Programme of Works.pdf
 05 Amendments - agreed deviations.pdf
 06 Scope of Works.pdf
 07 Basic Plant Specification.pdf
 07A Connection Permit.pdf
 07B Wastewater Treatment Plant Raw Data.xlsx
 07C Groundwater Raw Data.xlsx
 08 Plant Functionality.pdf
 09 Process and Plant Specification.pdf
 09A Consumption.pdf
 09A Consumption.xlsm
 09B Spec of Mech. Plant.pdf
 09B Spec of Mech. Plant.xlsm
 10 Codes, Standards and Regulations.pdf
 11 General Mechanical Specifications.pdf
 11A GMS Piping.pdf
 12 General Electrical and Control System Spec.pdf
 13 Documentation.pdf
 14 Training and Training Material.pdf
 15 Testing.pdf
 15A Performance Guarantee.pdf
 15A Performance Guarantee.xlsm
 16 Site Conditions.pdf
 18 Tender Dossier Drawings and Appendices.pdf
 19 List of Abbreviations.pdf
 Alternating.pdf
 Analog input control.pdf
 Annex 1.1 - Particular Conditions of Contract.pdf
 Annex 1.2 - General Conditions of Contract - Yellow FIDIC.pdf
 Annex 1.3 - Code of Conduct and ESG Principles.pdf
 Annex 1.4 - Performance Bond.pdf
 Auma control.pdf
 Behandling af betonloft.pdf
 Behandling af gipsvægge.pdf
 Contract notice.pdf
 Counter.pdf
 Declaration of consortium.docx
 Declaration of consortium.pdf
 Digital input control.pdf
 DIN Designmanual for structured cabling.pdf
 DIN Forsynings O&M (Operation and maintenance) ark.xlsx
 DIN PUBLISERET - IKT-SPECIFIKATIONER D2023-108370 5.0.pdf
 DIN QHSE Contract requirements DIN Forsyning.pdf
 Draft Contract Agreement.pdf
 Drawing- and documentlist_PWTP&RWTP.pdf
 Drawing- and documentlist_Underground piping.pdf
 Endelig geo rapport 23.6895.01. Mådevej 52 6700 Esbjerg.pdf
 FEED Study - Pure Water Treatment Plant (information only).pdf
 IDF UPW_K08_C08.08_ARBJord&Belægning_UK.pdf
 IDF-UPW_K01_C08.02_ARB-Maler-UK.pdf
 IDF-UPW_K01_C08.02_ARB-Murer-UK.pdf
 IDF-UPW_K01_C08.02_ARB-Tømrer-UK.pdf
 IDF-UPW_K01_C08_FarveMaterialeskema.pdf
 IDF-UPW_K01_C08_SurfaceRoomSchedule.pdf
 IDF-UPW_K01_T20_H1_E00_S1_N03.pdf
 IDF-UPW_K01_T20_H1_E01_S1_N02.pdf
 IDF-UPW_K01_T29_H1_E00_S1_N01.pdf
 IDF-UPW_K01_T29_H1_E01_S1_N01.pdf
 IDF-UPW_K01_T29_H1_E02_S1_N02.pdf
 IDF-UPW_K01_T29_H2_E01_S1_N04.pdf
 IDF-UPW_K01_T29_H3_E01_S1_N03.pdf
 IDF-UPW_K01_T35_H1_E02_S1_N03.pdf
 IDF-UPW_K01_T79_H1_E01_S1_N02.pdf
 IDF-UPW_K07_C08.02_ARB-EL-UK.pdf
 IDF-UPW_K07_T60_H01_E00_S1_N03.pdf
 IDF-UPW_K07_T635_H01_E00_S1_N01.pdf
 IDF-UPW_K07_T635_H01_E01_S1_N02.pdf
 IDF-UPW_K08_C08.02_ARB-AfløbJord-UK.pdf
 IDF-UPW_K08_C08.02_ARB-VVS-Ventilation-UK.pdf
 IDF-UPW_K08_T501_H01_EAN_S1_N01.pdf
 IDF-UPW_K08_T57_H01_E00_S1_N01.pdf
 IDF-UPW_K08_T57_H01_E00_S1_N02.pdf
 IDF-UPW_K08_T57_H01_E01_S1_N01.pdf
 IDF-UPW_K08_T57_H06_EUU_S1_N01.pdf
 IDF-UPW_K08_T57_H06_EUU_S1_N02.pdf
 IDF-UPW_K08_T57_H06_EUU_S1_N03.pdf
 IDF-UPW_K08_T59_H01_E00_S1_N01.pdf
 IDF-UPW_K08_T59_H01_E00_S1_N02.pdf
 IDF-UPW_K08_T59_H01_E01_S1_N01.pdf
 IDF-UPW_K08_T59_H01_ERO_S1_N01.pdf
 IDF-UPW_K09_C05_Main Structural Principles.pdf
 IDF-UPW_K09_C08.02_ARB-Betonelement-UK.pdf
 IDF-UPW_K09_C08.02_ARB-Beton-UK.pdf
 IDF-UPW_K09_C08.02_ARB-Stål-UK.pdf
 IDF-UPW_K10_T29_H1_ECI_N01_Underground Piping Phase 2 WWTP WEST Plan.pdf
 IDF-UPW_K10_T90_H1_ECI_N02_Underground_Piping_Pipeline_route.pdf
 IDF-UPW_K10_T90_H4_ECI_N01_Underground Piping Phase 1 WWTP East Plan.pdf
 IDF-UPW_K28_C8 - Preliminary fire strategy, Conceptual design-UK.pdf
 IDF-UPW_K28_T290_H01_E00_S1_N02.pdf
 IDF-UPW_K28_T290_H01_E01_S1_N02.pdf
 IDF-UPW_K99_C01_T999_Drawing- and documentlist.pdf
 IDF-UPW_K99_C08 Construction Project Description_UK.pdf
 ISA styleguide.pdf
 Motor control.pdf
 Notification of the processing of personal data.docx
 Notification of the processing of personal data.pdf
 Part 1 OT-Cyber security - Main document.pdf
 Part 2 OT-Cyber security - Renovation & new operation.pdf
 Part 3 OT-Cyber security - Additional hardware suppliers to OT.pdf
 Part 4 OT-Cyber security - Other suppliers with access to OT.pdf
 PFD-01_PWTP_CIP.pdf
 PFD-02_PWTP_Pumping Station.pdf
 PFD-03_PWTP_Influent.pdf
 PFD-04_PWTP_UF.pdf
 PFD-05_PWTP_UF Concentrator.pdf
 PFD-06_PWTP_RO Pre-Treatment.pdf
 PFD-07_PWTP_RO.pdf
 PFD-08_PWTP_PW Tank.pdf
 PFD-10_RWTP_Equalization tank.pdf
 PFD-11_RWTP_Membrane Bioreactor (MBR).pdf
 PFD-12_RWTP_Sludge Dewatering.pdf
 PFD-13_RWTP_GAC adsorption plant.pdf
 PFD-14_RWTP_GFH adsorption plant.pdf
 PFD-20_Utilities_Chemical Dosing.pdf
 PFD-21_Utilities_Pneumatics.pdf
 PFD-30_Sampling and measurement points.pdf
 PFD-31_Pure water discharge to WWTP East.pdf
 PID Control.pdf
 PLC Startup -Programming Guide.pdf
 PMD-01_PWTP & RWTP_Process Module Diagram.pdf
 Programming Design Guide.pdf
 Rensningsanlæg Øst Mådevej 52 Jordhåndtering_Rambøll 08-02-2024.pdf
 Reservations.xlsx
 Solemn declaration - 134a.docx
 Solemn declaration - 134a.pdf
 Solmn declaration - Russia.docx
 Solmn declaration - Russia.pdf
 Statement of support.docx
 Statement of support.pdf
 Tender conditions.pdf
 Tenderer's identification of risk and cost factors.docx
 Tenderer's identification of risk and cost factors.pdf
 Valve control analog.pdf
 Valve control digital.pdf
 Valve manuel digital.pdf
 VSD ABB.pdf
 VSD Danfoss.pdf
 Ydervægge base af beton indvendigt.pdf
Print...Close window