Document available to download | Size (kB) |
Other documents (Available after expression of interest) |
01 Schedule of Prices - SOP.pdf |
01 Schedule of Prices - SOP.xlsm |
03 Programme of Works.pdf |
05 Amendments - agreed deviations.pdf |
06 Scope of Works.pdf |
07 Basic Plant Specification.pdf |
07A Connection Permit.pdf |
07B Wastewater Treatment Plant Raw Data.xlsx |
07C Groundwater Raw Data.xlsx |
08 Plant Functionality.pdf |
09 Process and Plant Specification.pdf |
09A Consumption.pdf |
09A Consumption.xlsm |
09B Spec of Mech. Plant.pdf |
09B Spec of Mech. Plant.xlsm |
10 Codes, Standards and Regulations.pdf |
11 General Mechanical Specifications.pdf |
11A GMS Piping.pdf |
12 General Electrical and Control System Spec.pdf |
13 Documentation.pdf |
14 Training and Training Material.pdf |
15 Testing.pdf |
15A Performance Guarantee.pdf |
15A Performance Guarantee.xlsm |
16 Site Conditions.pdf |
18 Tender Dossier Drawings and Appendices.pdf |
19 List of Abbreviations.pdf |
Alternating.pdf |
Analog input control.pdf |
Annex 1.1 - Particular Conditions of Contract.pdf |
Annex 1.2 - General Conditions of Contract - Yellow FIDIC.pdf |
Annex 1.3 - Code of Conduct and ESG Principles.pdf |
Annex 1.4 - Performance Bond.pdf |
Auma control.pdf |
Behandling af betonloft.pdf |
Behandling af gipsvægge.pdf |
Contract notice.pdf |
Counter.pdf |
Declaration of consortium.docx |
Declaration of consortium.pdf |
Digital input control.pdf |
DIN Designmanual for structured cabling.pdf |
DIN Forsynings O&M (Operation and maintenance) ark.xlsx |
DIN PUBLISERET - IKT-SPECIFIKATIONER D2023-108370 5.0.pdf |
DIN QHSE Contract requirements DIN Forsyning.pdf |
Draft Contract Agreement.pdf |
Drawing- and documentlist_PWTP&RWTP.pdf |
Drawing- and documentlist_Underground piping.pdf |
Endelig geo rapport 23.6895.01. Mådevej 52 6700 Esbjerg.pdf |
FEED Study - Pure Water Treatment Plant (information only).pdf |
IDF UPW_K08_C08.08_ARBJord&Belægning_UK.pdf |
IDF-UPW_K01_C08.02_ARB-Maler-UK.pdf |
IDF-UPW_K01_C08.02_ARB-Murer-UK.pdf |
IDF-UPW_K01_C08.02_ARB-Tømrer-UK.pdf |
IDF-UPW_K01_C08_FarveMaterialeskema.pdf |
IDF-UPW_K01_C08_SurfaceRoomSchedule.pdf |
IDF-UPW_K01_T20_H1_E00_S1_N03.pdf |
IDF-UPW_K01_T20_H1_E01_S1_N02.pdf |
IDF-UPW_K01_T29_H1_E00_S1_N01.pdf |
IDF-UPW_K01_T29_H1_E01_S1_N01.pdf |
IDF-UPW_K01_T29_H1_E02_S1_N02.pdf |
IDF-UPW_K01_T29_H2_E01_S1_N04.pdf |
IDF-UPW_K01_T29_H3_E01_S1_N03.pdf |
IDF-UPW_K01_T35_H1_E02_S1_N03.pdf |
IDF-UPW_K01_T79_H1_E01_S1_N02.pdf |
IDF-UPW_K07_C08.02_ARB-EL-UK.pdf |
IDF-UPW_K07_T60_H01_E00_S1_N03.pdf |
IDF-UPW_K07_T635_H01_E00_S1_N01.pdf |
IDF-UPW_K07_T635_H01_E01_S1_N02.pdf |
IDF-UPW_K08_C08.02_ARB-AfløbJord-UK.pdf |
IDF-UPW_K08_C08.02_ARB-VVS-Ventilation-UK.pdf |
IDF-UPW_K08_T501_H01_EAN_S1_N01.pdf |
IDF-UPW_K08_T57_H01_E00_S1_N01.pdf |
IDF-UPW_K08_T57_H01_E00_S1_N02.pdf |
IDF-UPW_K08_T57_H01_E01_S1_N01.pdf |
IDF-UPW_K08_T57_H06_EUU_S1_N01.pdf |
IDF-UPW_K08_T57_H06_EUU_S1_N02.pdf |
IDF-UPW_K08_T57_H06_EUU_S1_N03.pdf |
IDF-UPW_K08_T59_H01_E00_S1_N01.pdf |
IDF-UPW_K08_T59_H01_E00_S1_N02.pdf |
IDF-UPW_K08_T59_H01_E01_S1_N01.pdf |
IDF-UPW_K08_T59_H01_ERO_S1_N01.pdf |
IDF-UPW_K09_C05_Main Structural Principles.pdf |
IDF-UPW_K09_C08.02_ARB-Betonelement-UK.pdf |
IDF-UPW_K09_C08.02_ARB-Beton-UK.pdf |
IDF-UPW_K09_C08.02_ARB-Stål-UK.pdf |
IDF-UPW_K10_T29_H1_ECI_N01_Underground Piping Phase 2 WWTP WEST Plan.pdf |
IDF-UPW_K10_T90_H1_ECI_N02_Underground_Piping_Pipeline_route.pdf |
IDF-UPW_K10_T90_H4_ECI_N01_Underground Piping Phase 1 WWTP East Plan.pdf |
IDF-UPW_K28_C8 - Preliminary fire strategy, Conceptual design-UK.pdf |
IDF-UPW_K28_T290_H01_E00_S1_N02.pdf |
IDF-UPW_K28_T290_H01_E01_S1_N02.pdf |
IDF-UPW_K99_C01_T999_Drawing- and documentlist.pdf |
IDF-UPW_K99_C08 Construction Project Description_UK.pdf |
ISA styleguide.pdf |
Motor control.pdf |
Notification of the processing of personal data.docx |
Notification of the processing of personal data.pdf |
Part 1 OT-Cyber security - Main document.pdf |
Part 2 OT-Cyber security - Renovation & new operation.pdf |
Part 3 OT-Cyber security - Additional hardware suppliers to OT.pdf |
Part 4 OT-Cyber security - Other suppliers with access to OT.pdf |
PFD-01_PWTP_CIP.pdf |
PFD-02_PWTP_Pumping Station.pdf |
PFD-03_PWTP_Influent.pdf |
PFD-04_PWTP_UF.pdf |
PFD-05_PWTP_UF Concentrator.pdf |
PFD-06_PWTP_RO Pre-Treatment.pdf |
PFD-07_PWTP_RO.pdf |
PFD-08_PWTP_PW Tank.pdf |
PFD-10_RWTP_Equalization tank.pdf |
PFD-11_RWTP_Membrane Bioreactor (MBR).pdf |
PFD-12_RWTP_Sludge Dewatering.pdf |
PFD-13_RWTP_GAC adsorption plant.pdf |
PFD-14_RWTP_GFH adsorption plant.pdf |
PFD-20_Utilities_Chemical Dosing.pdf |
PFD-21_Utilities_Pneumatics.pdf |
PFD-30_Sampling and measurement points.pdf |
PFD-31_Pure water discharge to WWTP East.pdf |
PID Control.pdf |
PLC Startup -Programming Guide.pdf |
PMD-01_PWTP & RWTP_Process Module Diagram.pdf |
Programming Design Guide.pdf |
Rensningsanlæg Øst Mådevej 52 Jordhåndtering_Rambøll 08-02-2024.pdf |
Reservations.xlsx |
Solemn declaration - 134a.docx |
Solemn declaration - 134a.pdf |
Solmn declaration - Russia.docx |
Solmn declaration - Russia.pdf |
Statement of support.docx |
Statement of support.pdf |
Tender conditions.pdf |
Tenderer's identification of risk and cost factors.docx |
Tenderer's identification of risk and cost factors.pdf |
Valve control analog.pdf |
Valve control digital.pdf |
Valve manuel digital.pdf |
VSD ABB.pdf |
VSD Danfoss.pdf |
Ydervægge base af beton indvendigt.pdf |