CTM
Instructions:
Here are all documents for specified package. Some documents are available to download without the need to logon.
Documents - Package 523921:1 - Purchase of a new VHP pass through decontamination chamber
Document available to download
Size (kB)
Appendix 1 - Customer's Responsible Supply Chain Management.pdf
61
Appendix 2 - Specification of requirements - BXX_URS VHP decontamination chamber.docx
843
Appendix 2.1 - Current VHP location BXX.pdf
225
Appendix 2.2 - Images current VHP chamber.pdf
245
Appendix 2.3 - BXX pressure cascade_1floor.pdf
158
Appendix 2.4 - Load Fractions 1-13.pdf
905
Appendix 2.5 - Operational options.pdf
186
Appendix 2.6 - Product sheet for PAPR load.pdf
5461
Appendix 2.7 - Assembly drawing
677
Appendix 2.8 - Close-up of assembly drawing
356
Appendix 3 - Information for External Staff at SSI Campus
601
Appendix 4 - The Vendor's solution description REV1
97
Appendix 5 - Price list REV1
17
Appendix A - Statement of support
58
Appendix B - Consortium statement
59
Appendix C - Declaration of Russian involvement in the Contract
61
Appendix X - Identification of inconveniences and subjects to discuss during negotiations
35
Contract DRAFT REV1
480
Tender Conditions REV1
292
Print...
Close window