Instructions: Here are all documents for specified package. Some documents are available to download without the need to logon.
| | Documents - Package 525915:1 - Installation of 3000 GPD Ultra Filtration (UF) Water Treatment Plant with Construction of Plant Room/Building Structure |
| Document available to download | Size (kB) | | Other documents (Available after expression of interest) | | FRDP-IFT-WHH-PAK 1124 - Construction of Filtration Plant - final.docx |
|
|