BG-ITT1 - Design and build Biogas Plant in Finnsnes, Norway.

De Aanvraag is gesloten. U kunt de uitnodiging niet meer accepteren.
Deze Aanvraag is geannuleerd. U kunt niet meer reageren.

The project involves the construction of a biogas plant in Finnsnes, Northern Norway, located adjacent to an existing waste-to-energy district heating facility. The plant will be designed to process approximately 65,000 tonnes of organic waste annually, including food waste, sewage sludge, fish waste, and similar feedstocks. The facility must produce biogas, with the final product being liquefied vehicle fuel. The selected contractor will be responsible for the design, engineering, construction, and commissioning of the biogas plant.

17-2-2025 12:00:00

45255800-7  Bouwen van gasproductie-installatie
42113390-4  Stookgassystemen
45250000-4  Bouwwerkzaamheden voor krachtcentrale, mijnbouw en industrie, en voor gebouwen in verband met olie- en gasindustrie
76000000-3  Diensten in verband met de olie- en gasindustrie
45222100-0  Bouwen van afvalverwerkingsinstallatie
09110000-3  Vaste brandstoffen
09120000-6  Gasvormige brandstoffen
09100000-0  Brandstoffen
45255000-9  Bouwwerkzaamheden voor de olie- en gasindustrie


Rå Biopark AS
Bulldosarveien 271
9143
Skibotn
Noorwegen
Bekijk dit profiel

Morten Bangås

Aankondigingen
Contractwaarschuwing – licht regime (eForm) 14-1-2025 12:01 Originele aankondigingspublicatie
Percelen
Design and build Biogas Plant in Finnsnes, Norway.

This contract pertains to the design and construction of a biogas plant for processing food waste and sewage sludge, producing liquefied biogas (LBG). The facility will be built in an Arctic climate in Finnsnes, Northern Norway, with construction scheduled to commence in 2025.

Inhoud:
Documenten Documenten
Sluiten