The procurement concerns the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of equipment for the Power Transformer and 132 kV SF6 Free Gas insulated switchgear installation at the Svanemøllen Energy Centre (SMC). The procurement is divided into the following lots: Lot 1 – Power Transformers Design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of power transformers, including cooling equipment, accessories, auxiliary, documentation and training. Lot 2 – 132 kV Gas Insulated Switchgear (GIS) Design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of 132 kV SF6 Free Gas Insulated Switchgear, including associated local control cubicles, monitoring equipment, accessories, auxiliary, documentation and training. The detailed scope of each lot is described in the technical requirements and the contract documents.
27/11/2026 14:00:00
31100000-7 Electric motors, generators and transformers
31170000-8 Transformers
31171000-5 Liquid dielectric transformers
31172000-2 Voltage transformers
31214000-9 Switchgear
31200000-8 Electricity distribution and control apparatus
31213200-4 Distribution transformers
31214500-4 Electric switchboards
31682540-7 Substation equipment
45315700-5 Switching station installation work
45315400-2 High voltage installation work
31000000-6 Electrical machinery, apparatus, equipment and consumables; lighting
HOFOR A/S
Ørestads Boulevard 35
2300
København S
Denmark
View profile
Shazaib Qasim
http://www.hofor.dk/
| Notice | Date of dispatch | |
|---|---|---|
| Contract or concession notice – standard regime (eForm) | 27/10/2026 23:01 | Original notice publication |
The procurement concerns the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of equipment for the Power Transformer and 132 kV SF6 Free Gas insulated switchgear installation at the Svanemøllen Energy Centre (SMC). This lot is lot nr. 1 Power Transformer.
Svanemøllen Energicentral omhandler opførelse af en energicentral til afløsning af det gamle "Svanemølleværk", der skal omdannes til teknisk museum. Energicentralen omfatter ny bygning på den gamle kulplads og installation af flere forskellige energikilder, f.eks. havvandsvarmepumper, elkedler og gaskedler.
The procurement concerns the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of equipment for the Power Transformer and 132 kV SF6 Free Gas insulated switchgear installation at the Svanemøllen Energy Centre (SMC). This lot is lot nr. 2 132 kV SF6 Free Gas insulated switchgear.
Svanemøllen Energicentral omhandler opførelse af en energicentral til afløsning af det gamle "Svanemølleværk", der skal omdannes til teknisk museum. Energicentralen omfatter ny bygning på den gamle kulplads og installation af flere forskellige energikilder, f.eks. havvandsvarmepumper, elkedler og gaskedler.