Mandatory requirement
Document attachment required to answer
Document attachment allowed to answer
Expires
2. Procedures & Instructions
2
Supplier accepts the procedures as stated in chapter 2.
Yes
No
.
3. Selection criteria
3.2.1
Candidates have attached a signed European Single Procurement Document (ESPD) in which you agree to fulfill to the minimum requirements as stated in 3.3 and 3.4
Yes
No
3.4.1
Candidates have attached references that demonstrate the required main competences.
Document upload
4. Specifications and award criteria
4.2.1-4.2.8
Supplier confirms that the scope and design complies to the technical requirements Deviations, if any, will be clearly specified. Minimun required Documentation is uploaded. )See tenderguide 4.2.1-4.2.8)
Ja
Nee
4.3.1
Supplier has uploaded the required information as part of 4.2, this information will be evaluated.
Yes
No
4.3.2
Supplier is requested to upload its reply to the Back-up solution.
Document upload
4.3.3
Supplieris requested to upload its reply to the project schedule/ delivery time.
Document upload
4.3.4
Supplier is requested to upload its reply to the contract flexibility.
Document upload
4.4.1
Supplier is requested to quote item list in CTM and upload the excel calculation sheet.
Document upload
4.4.2
Supplier accepts the concept agreement, Alterations, if any, are generally but cleary specified refering to the applicable clause.