Mandatory requirement
Document attachment required to answer
Document attachment allowed to answer
Expires
2. Procedures & Instructions
2
Supplier accepts the procedures as stated in chapter 2.
Yes
No
3. Selection criteria
3.2.1
Candidates have attached a signed European Single Procurement Document (ESPD) in which you agree to fulfill to the minimum requirements as stated in 3.3 and 3.4
Yes
No
3.4.1
Candidates have attached references that demonstrate the required main competences.
Document upload
4. Specifications and award criteria
4.4.1
Supplier confirms that the scope and design complies to the technical requirements 4.1 & 4.2 Deviations, if any, will be clearly specified in the technical proposal. Minimun required Documentation/ technical proposal is uploaded.
Document upload
4.4.2
Supplier confirms that the scope and design complies to the technical requirements 4.3 Deviations, if any, will be clearly specified in the technical proposal. Minimun required Documentation/ technical proposal is uploaded.
Document upload
4.4.3
Supplieris requested to upload its reply to the project schedule/ delivery time.
Document upload
4.4.4
Supplier is requested to upload its reply to the contract flexibility.
Document upload
4.5.1
Supplier is requested to quote total project value in CTM and upload the price breakdown