This contract includes the delivery of a DS/IEC/IEEE 80005 compliant Shore Power System (SPS) in the Port of Aar-hus, Denmark. The SPS supply one ship at a time at a specific berth at Polensgade, Aarhus C. The cruise ship terminal in question can accept ships with a size of up to approx. 300 m LOA. The contract includes: converter station, Medium voltage underground cabling between SPS and connection boxes, mobile cable management device, training of personel etc., see furthermore section II.2.4.
11-01-2021 12:00:00
31200000-8 Electricity distribution and control apparatus
45315300-1 Electricity supply installations
45255420-9 Onshore fabrication work
45311000-0 Electrical wiring and fitting work
71323100-9 Electrical power systems design services
45317200-4 Electrical installation work of transformers
31682540-7 Substation equipment
51111300-6 Installation services of transformers
45311200-2 Electrical fitting work
51112000-0 Installation services of electricity distribution and control equipment
51110000-6 Installation services of electrical equipment
Port of Aarhus
Vandvejen 7
8000
Aarhus C
Denmark
KAPS - Cecilie Hansen
Notice | Date of dispatch |
---|---|
05. Contract notice - utilities (TED (v209)) | 09-12-2020 16:26 |
06. Contract award notice - utilities (TED (v209)) | 03-12-2021 12:40 |