The tender concerns the supply and assembly of a water treatment facility. The background for the tender is that a new low-temperature district heating network (LT network) is to be established at Vestforbrænding receiving, among others, surplus heat from a CCS facility. Surplus heat from the carbon capture (CC) process corresponds to 50 MW LT heat from which the new district heating station is designed. The heat from the new CC facility is to feed one LT network through a new pump station (forward and return) that will be established in the furnace basement, level +6.5. The new low-temperature network is hydraulically decoupled from Vestforbrænding’s existing network and must therefore be equipped with own pressure holding tank and make-up water system. In this connection, a water treatment system is needed for the pressure holding tank and make-up water system.
04/07/2025 12:00:00
42514300-5 Filtering apparatus
45252120-5 Water-treatment plant construction work
I/S Vestforbrænding og datterselskaber
Ejby Mosevej 219
2600
Glostrup
Denmark
View profile
Asbjørn Thorup
Notice | Date of dispatch | |
---|---|---|
Contract or concession notice – standard regime (eForm) | 03/06/2025 17:31 | Original notice publication |