Date of dispatch of this notice: 10/10/2016
Expire date: 08/11/2016
External Reference: 2016-676537
TED Reference: 2016/S 199-359971
Date of dispatch of this notice: 10/10/2016
Expire date: 08/11/2016
External Reference: 2016-676537
TED Reference: 2016/S 199-359971
Fuel handling system
Västerås
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 – 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 – 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/44) relates to the purchase of a fuel handling system to supply the boiler with solid fuel. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
This procurement (Dnr 2016/44) relates to the purchase of a fuel handling system to supply the boiler with solid fuel. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
Dnr 2016/44