II.1)
Scope of the procurement
Flue gas treatment system
Reference number:
Dnr 2016/42
42165000
-
Steam condensers
Supplies
II.1.4)
Short description
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås.
The Project consists of four main parts: A steam boiler of 150 – 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 – 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel.
This procurement (Dnr 2016/42) relates to the purchase of a flue gas treatment system including a combination of dry and wet technology. The system shall include heat recovery from flue gas condensation with condensate cleaning and shall treat flue gas from combustion of recycled wood, i.e. wood waste (used wood) including demolition wood.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
42511200
-
Machinery for liquefying air or other gases
42514000
-
Machinery and apparatus for filtering or purifying gases
II.2.3)
Place of performance
NUTS code:
SE125 -
Västmanlands län
Main site or place of performance:
Västerås
II.2.4)
Description of the procurement
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås.
The Project consists of four main parts: A steam boiler of 150 – 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 – 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel.
This procurement (Dnr 2016/42) relates to the purchase of a flue gas treatment system including a combination of dry and wet technology. The system shall include heat recovery from flue gas condensation with condensate cleaning and shall treat flue gas from combustion of recycled wood, i.e. wood waste (used wood) including demolition wood.
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no