II.1)
Scope of the procurement
Fuel handling system
Reference number:
Dnr 2016/44
42164000
-
Auxiliary plant for use with boilers
Supplies
II.1.4)
Short description
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 – 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 – 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/44) relates to the purchase of a fuel handling system to supply the boiler with solid fuel. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.3)
Place of performance
NUTS code:
SE125 -
Västmanlands län
Main site or place of performance:
Västerås
II.2.4)
Description of the procurement
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 – 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 – 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/44) relates to the purchase of a fuel handling system to supply the boiler with solid fuel. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no