Section number:
II.2.14)
Instead of:
Section II.1.5) and II.2.6): This is the maximum available subsidy for the entire duration of the Contract (subject to indexation). Section II.2.7): The Contract is expected to have a duration of approx. 20-21 years (240-252 months) of operation (in addition to the prior pre-construction and construction phases). Section II.2.9): Each candidate may only submit one application for prequalification.
Read:
Section II.1.5) and II.2.6): This is the maximum available subsidy for the entire duration of the Contract (subject to indexation). The subsidy is including VAT.
Section II.2.7): The Contract is expected to have a duration of approx. 20-21 years (240-252 months) of operation (in addition to the prior pre-construction and construction phases).
Section II.2.9): Each candidate may only submit one application for prequalification.
Section number:
IV.2.2)
Instead of:
Date:
07/07/2022
Local time:
23:59
Read:
Date:
01/08/2022
Local time:
23:59
Section number:
IV.2.3)
Instead of:
Date:
20/07/2022
Section number:
VI.3)
Instead of:
Questions regarding prequalification must be submitted not later than 23 June 2022.
Read:
Questions regarding prequalification must be submitted not later than 18 July 2022.
The DEA has received an indicative opinion (in Danish: "vejledende udtalelse") from the Danish Tax Energy Agency according to which the subsidy is subject to VAT. The correction in the contract notice is made to reflect that the maximum available subsidy amount is including VAT. Please refer to the address stated in the contract notice, section I.3), for further information.
The DEA has prolonged the deadline for requests for participation until 1 August 2022 at 23:59 local time. Questions regarding prequalification must be submitted not later than 18 July 2022. The estimated date of dispatch of invitations to tender or to participate to selected candidates is 12 August 2022.