2
Supplier accepts the procedures as stated in chapter 2.
Yes
No
3. Selection criteria
3.2.1
Candidates have attached a signed European Single Procurement Document (ESPD) in which you agree to fulfill to the minimum requirements as stated in 3.3 and 3.4
Yes
No
3.4.1
Candidates have attached references that demonstrate the required main competences.
[DocumentUploadType]
4. Specifications and award criteria
4.4.1
Supplier confirms that the scope and design complies to the technical requirements 4.1 & 4.2 Deviations, if any, will be clearly specified in the technical proposal. Minimun required Documentation/ technical proposal is uploaded.
[DocumentUploadType]
4.4.2
Supplier confirms that the scope and design complies to the technical requirements 4.3 Deviations, if any, will be clearly specified in the technical proposal. Minimun required Documentation/ technical proposal is uploaded.
[DocumentUploadType]
4.4.3
Supplieris requested to upload its reply to the project schedule/ delivery time.
[DocumentUploadType]
4.4.4
Supplier is requested to upload its reply to the contract flexibility.
[DocumentUploadType]
4.5.1
Supplier is requested to quote total project value in CTM and upload the price breakdown