Wind tunnel tests on so-called 2D airfoils will be carried out in the Poul la Cour Tunnel (PLCT), Denmark, in the first half year of 2021. This will be done on a family of wind turbine airfoils corresponding to five to six airfoils. Tests will be carried out about one week at a time, so to be able to carry out the campaigns before 1 July it is planned to manufacture the airfoils in a sequence that corresponds to the sequence made for the tests. For more information about the wind tunnel – see www.plct.dk.
13-1-2021 12:00:00
38126400-8 Oppervlakte-observatieapparatuur voor wind
31121330-2 Windturbinegeneratoren
38121000-9 Windmeters
Danmarks Tekniske Universitet - DTU
Anker Engelunds Vej 1
2800
Kgs. Lyngby
Denemarken
Bekijk dit profiel
Michael Nyberg
https://www.dtu.dk
Type | Publicatiedatum |
---|---|
Supplies Services (Udbud.DK) | 22-12-2020 22:00 |