The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 18 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S requires de-sign, procurement and building/installation, testing and commissioning and maintenance of a power supply station. This will be located at Rødbyhavn on Lolland. Energinet.dk will design and construct the connection with the grid to provide the 132 kV pri-mary system (including switchgear, housings and bus bars) under a separate contract. The Tunnel Power Supply (TPS) contract relates to the design, construction and maintenance of the system and the ancillary works. This should be achieved while observing Femern A/S' CSR poli-cies.
17/05/2021 13:00:00
45232221-7 Subestação transformadora
45317200-4 Instalação eléctrica de transformadores
31151000-9 Conversores estáticos
31155000-7 Inversores
31156000-4 Fontes de alimentação interruptas
31214000-9 Comutadores
31682210-5 Equipamento de instrumentação e de comando
45232220-0 Construção de subestação
45300000-0 Instalações em edifícios
45315300-1 Instalações de abastecimento de electricidade
50000000-5 Serviços de reparação e manutenção
50532000-3 Serviços de reparação e manutenção de máquinas e aparelhos eléctricos e de equipamento afim
50532200-5 Serviços de reparação e manutenção de transformadores
71541000-2 Serviços de gestão de projectos de construção
Femern Bælt A/S
Vester Søgade 10
1601
København V
[DK]
Femern - Jimmie Bøllingtoft
| [Notice] | [DispatchDate] |
|---|---|
| [TedS09F05ContractUtilities] ([TedS09]) | 12/04/2021 13:10 |
| [TedS09F06ContractAwardNoticeUtilities] ([TedS09]) | 22/12/2022 10:13 |