The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 18 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S requires de-sign, procurement and building/installation, testing and commissioning and maintenance of a power supply station. This will be located at Rødbyhavn on Lolland. Energinet.dk will design and construct the connection with the grid to provide the 132 kV pri-mary system (including switchgear, housings and bus bars) under a separate contract. The Tunnel Power Supply (TPS) contract relates to the design, construction and maintenance of the system and the ancillary works. This should be achieved while observing Femern A/S' CSR poli-cies.
17/5/2021 1:00:00 μμ
45232221-7 Υποσταθμός μετασχηματιστών
45317200-4 Εργασίες ηλεκτρικής εγκατάστασης μετασχηματιστών
31151000-9 Στατικοί μεταλλάκτες
31155000-7 Αναστροφείς συχνότητας
31156000-4 Διακοπτόμενα τροφοδοτικά ρεύματος
31214000-9 Μηχανισμός διακοπής
31682210-5 Όργανα και εξοπλισμός ελέγχου
45232220-0 Κατασκευαστικές εργασίες για υποσταθμούς
45300000-0 Εργασίες κτιριακών εγκαταστάσεων
45315300-1 Εγκαταστάσεις ηλεκτρικής παροχής
50000000-5 Υπηρεσίες επισκευής και συντήρησης
50532000-3 Υπηρεσίες επισκευής και συντήρησης ηλεκτρικών μηχανημάτων, συσκευών και συναφούς εξοπλισμού
50532200-5 Υπηρεσίες επισκευής και συντήρησης μετασχηματιστών
71541000-2 Υπηρεσίες διαχείρισης κατασκευαστικών έργων
Femern Bælt A/S
Vester Søgade 10
1601
København V
Δανία
Femern - Jimmie Bøllingtoft
Προκήρυξη | [DispatchDate] |
---|---|
[TedS09F05ContractUtilities] ([TedS09]) | 12/4/2021 13:10 |
[TedS09F06ContractAwardNoticeUtilities] ([TedS09]) | 22/12/2022 10:13 |