Mandatory requirement
Pièce jointe requise pour répondre
Document attachment allowed to answer
Expire
2. Procedures & Instructions
2
Supplier accepts the procedures as stated in chapter 2.
Yes
No
.
3. Selection criteria
3.2.1
Candidates have attached a signed European Single Procurement Document (ESPD) in which you agree to fulfill to the minimum requirements as stated in 3.3 and 3.4
Yes
No
3.4.1
Candidates have attached references that demonstrate the required main competences.
Téléchargement de document
4. Specifications and award criteria
4.2.1-4.2.8
Supplier confirms that the scope and design complies to the technical requirements Deviations, if any, will be clearly specified. Minimun required Documentation is uploaded. )See tenderguide 4.2.1-4.2.8)
Ja
Nee
4.3.1
Supplier has uploaded the required information as part of 4.2, this information will be evaluated.
Yes
No
4.3.2
Supplier is requested to upload its reply to the Back-up solution.
Téléchargement de document
4.3.3
Supplieris requested to upload its reply to the project schedule/ delivery time.
Téléchargement de document
4.3.4
Supplier is requested to upload its reply to the contract flexibility.
Téléchargement de document
4.4.1
Supplier is requested to quote item list in CTM and upload the excel calculation sheet.
Téléchargement de document
4.4.2
Supplier accepts the concept agreement, Alterations, if any, are generally but cleary specified refering to the applicable clause.