The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 18 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S requires de-sign, procurement and building/installation, testing and commissioning and maintenance of a power supply station. This will be located at Rødbyhavn on Lolland. Energinet.dk will design and construct the connection with the grid to provide the 132 kV pri-mary system (including switchgear, housings and bus bars) under a separate contract. The Tunnel Power Supply (TPS) contract relates to the design, construction and maintenance of the system and the ancillary works. This should be achieved while observing Femern A/S' CSR poli-cies.
2021-05-17 13:00:00
45232221-7 Transformatorunderstation
45317200-4 Elinstallation av transformatorer
31151000-9 Statiska omvandlare
31155000-7 Växelriktare
31156000-4 Diskontinuerlig strömförsörjning
31214000-9 Ställverk
31682210-5 Instrumenterings- och styrsystem
45232220-0 Byggnation av undercentral
45300000-0 Byggnadsinstallationsarbeten
45315300-1 Anläggningar för elförsörjning
50000000-5 Reparation och underhåll
50532000-3 Reparation och underhåll av elektriska maskiner, apparater och tillhörande utrustning
50532200-5 Reparation och underhåll av transformatorer
71541000-2 Byggteknisk projektledning
Femern Bælt A/S
Vester Søgade 10
1601
København V
Danmark
Femern - Jimmie Bøllingtoft
| Annons | Utsändningsdatum |
|---|---|
| 05.Meddelande om upphandling – försörjningssektorerna (TED (v209)) | 2021-04-12 13:10 |
| 06. Meddelande om tilldelning av kontrakt – försörjningssektorerna (TED (v209)) | 2022-12-22 10:13 |