The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 18 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S requires de-sign, procurement and building/installation, testing and commissioning and maintenance of a power supply station. This will be located at Rødbyhavn on Lolland. Energinet.dk will design and construct the connection with the grid to provide the 132 kV pri-mary system (including switchgear, housings and bus bars) under a separate contract. The Tunnel Power Supply (TPS) contract relates to the design, construction and maintenance of the system and the ancillary works. This should be achieved while observing Femern A/S' CSR poli-cies.
17.05.2021 13:00:00
45232221-7 Transformatorunderstasjon
45317200-4 Elektrisk installasjon til transformere
31151000-9 Statiske omformere
31155000-7 Invertere
31156000-4 Avbrutte strømforsyninger
31214000-9 Koblingsutstyr
31682210-5 Instrument- og betjeningsutstyr
45232220-0 Bygge- og anleggsarbeid i forbindelse med Understasjon
45300000-0 Byggningsinnstallasjonsarbeid
45315300-1 Strømforsyningsinstallasjoner
50000000-5 Reperasjons- og vedlikeholdstjenester
50532000-3 Reparasjon og vedlikehold av elektriske maskiner, apparater og tilhørende utstyr
50532200-5 Reparasjon og vedlikehold av transformatorer
71541000-2 Byggeteknisk prosjektledelse
Femern Bælt A/S
Vester Søgade 10
1601
København V
Danmark
Femern - Jimmie Bøllingtoft
Kunngjøring | Dato for oversendelse |
---|---|
05.Kunngjøring av konkurranse - forsyning (TED (v209)) | 12.04.2021 13:10 |
06. Kontraktstildeling - forsyning (TED (v209)) | 22.12.2022 10:13 |