7620 - LIMS for radiopharmaceutical production (re-tender)

DTU requires a LIMS for radiopharmaceutical production for The Hevesy Laboratory of the Technical University of Denmark. The Hevesy Laboratory is the radiopharmaceutical unit, which combines cut-ting-edge research on radionuclides with the commercial production of radiopharmaceuticals. DTU intends to buy a LIMS which is a software that retrieve data from analytical equipment to pro-duce solely digital documentation. The system must also include step by step procedures of manufac-turing process and a quality management system. DTU wants this to be at software package, which is implemented, however, DTU needs support of the system afterwards. DTU is aware that there will ex-penses for licenses and service for the maintenance of the system in the contract period.

2024-08-28 12:00:00

72250000-2  Systeem- en ondersteuningsdiensten
72000000-5  IT-diensten: adviezen, softwareontwikkeling, internet en ondersteuning
72200000-7  Softwareprogrammering en -advies
72260000-5  Diensten in verband met software


Danmarks Tekniske Universitet - DTU
Anker Engelunds Vej 1
2800
Kgs. Lyngby
Denemarken
Bekijk dit profiel

Marianne Dauding
https://www.dtu.dk

Aankondigingen
Contract of concessie kennisgeving – standaard regime (eForm) 2024-06-03 15:01 Originele aankondigingspublicatie
Contract of concessie kennisgeving – standaard regime (eForm) 2024-08-13 16:08 Kennisgeving voor wijzigingen
Contract of concessie aankondiging – standaard regime (eForm) 2024-12-16 22:01 Originele aankondigingspublicatie
Percelen
LIMS for radiopharmaceutical production (re-tender)

DTU requires a LIMS for radiopharmaceutical production for The Hevesy Laboratory of the Technical University of Denmark. The Hevesy Laboratory is the radiopharmaceutical unit, which combines cut-ting-edge research on radionuclides with the commercial production of radiopharmaceuticals. DTU intends to buy a LIMS which is a software that retrieve data from analytical equipment to pro-duce solely digital documentation. The system must also include step by step procedures of manufac-turing process a

Inhoud: Documenten
Sluiten