Datum van verzending van deze aankondiging: 10-10-2016
Vervaldatum: 8-11-2016
Externe referentie: 2016-811544
TED referentie: 2016/S 199-359970
Datum van verzending van deze aankondiging: 10-10-2016
Vervaldatum: 8-11-2016
Externe referentie: 2016-811544
TED referentie: 2016/S 199-359970
Steam turbine
Västerås
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 – 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 – 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/43) relates to the purchase of a district heating condensing steam turbine of about 55 – 65 MWe.
This procurement (Dnr 2016/43) relates to the purchase of a district heating condensing steam turbine of about 55 – 65 MWe.
Dnr 2016/43