II.1)
Scope of the procurement
Steam turbine
Reference number:
Dnr 2016/43
42112100
-
Steam turbines
Supplies
II.1.4)
Short description
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 – 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 – 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/43) relates to the purchase of a district heating condensing steam turbine of about 55 – 65 MWe.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
31124000
-
Steam-turbine generator and related apparatus
51133000
-
Installation services of turbines
II.2.3)
Place of performance
NUTS code:
SE125 -
Västmanlands län
Main site or place of performance:
Västerås
II.2.4)
Description of the procurement
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 – 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 – 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/43) relates to the purchase of a district heating condensing steam turbine of about 55 – 65 MWe.
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no