20/02384 - Case Study regarding hydrogen pipelines

Le consultation est terminé, vous ne pouvez pas répondre à l'invitation.

Energinet is in the process of building up knowledge on hydrogen infrastructure. As part of this, Energinet would like to obtain initial guiding on the cost implicated with retrofitting/refurbishing one of the existing natural gas pipelines between Egtved and Frøslev for hydrogen transport, compared to the cost of a new dedicated hydrogen pipeline with the same capacity. As part of this investigation, the technical requirements and issues related to both refurbishing of existing and construction of a new pipeline should be presented in a report, including a discussion of pipeline capacity, strengths and weaknesses of pipeline reassignment alternatives, and any other technical specifications/requirements deemed relevant for this case study. The full suite of tender documents, including tender conditions, scope of services and contract draft will be issued to the prequalified applicants upon prequalification.

22/01/2021 12:00:00

76100000-4  Services professionnels relatifs à l'industrie du gaz
76600000-9  Services de contrôle de pipelines


Energinet
Tonne Kjærsvej 65
7000
Fredericia
Danemark
Voir le profil

Helle Barløse
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET

Avis publiés
Supplies Services (Udbud.DK) 12/01/2021 16:01
Marchés
Case Study regarding hydrogen pipelines
Information additionnelle:
Liste fichiers (téléchargement anonyme éventuel) Liste fichiers (téléchargement anonyme éventuel)
Fermer