The objective of this study is the technical and economic feasibility of a carbon capture facility for the waste CHP plant owned and operated by Fjernvarme Fyn Affald A/S (FFA). FFA receives approximately 280.000 t/year of mixed waste and consequently the captured CO2 will be a mix of fossil and biogenic CO2. The major part of the biogenic CO2 is assumed to be utilized by Fortum for methanol production to the extent that this is feasible (to be investigated by Fortum in separate study) whereas not utlised CO2 shall be stored permanently.
23/1/2023 1:00:00 μμ
71318000-0 Υπηρεσίες παροχής συμβουλών και γνωμοδότησης σε θέματα μηχανικού
71600000-4 Υπηρεσίες τεχνικών δοκιμών, ανάλυσης και παροχής συμβουλών
90713000-8 Υπηρεσίες παροχής συμβουλών για περιβαλλοντικά ζητήματα
Fjernvarme Fyn
Havnegade 120
5000
Odense C
Δανία
Jette Køhler
https://www.fjernvarmefyn.dk/
| Προκήρυξη | [DispatchDate] |
|---|---|
| [TedS09F05ContractUtilities] ([TedS09]) | 6/1/2023 11:27 |
| [TedS09F06ContractAwardNoticeUtilities] ([TedS09]) | 25/8/2023 00:12 |