The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 18 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S requires de-sign, procurement and building/installation, testing and commissioning and maintenance of a power supply station. This will be located at Rødbyhavn on Lolland. Energinet.dk will design and construct the connection with the grid to provide the 132 kV pri-mary system (including switchgear, housings and bus bars) under a separate contract. The Tunnel Power Supply (TPS) contract relates to the design, construction and maintenance of the system and the ancillary works. This should be achieved while observing Femern A/S' CSR poli-cies.
17/05/2021 13:00:00
45232221-7 Sous-station de transformation
45317200-4 Travaux d'installation électrique de transformateurs
31151000-9 Convertisseurs statiques
31155000-7 Onduleurs
31156000-4 Alimentation interruptible en courant
31214000-9 Appareillage de commutation
31682210-5 Instruments et équipement de commande et de contrôle
45232220-0 Travaux de construction de sous-stations
45300000-0 Travaux d'équipement du bâtiment
45315300-1 Installations d'alimentation électrique
50000000-5 Services de réparation et d'entretien
50532000-3 Services de réparation et d'entretien de machines et d'appareils électriques et de matériel connexe
50532200-5 Services de réparation et d'entretien de transformateurs
71541000-2 Services de gestion de projets de construction
Femern Bælt A/S
Vester Søgade 10
1601
København V
Danemark
Femern - Jimmie Bøllingtoft
Avis | Date d'envoi |
---|---|
Avis de marché – secteurs spéciaux (TED (v209)) | 12/04/2021 13:10 |
Avis d'attribution de marché – secteurs spéciaux (TED (v209)) | 22/12/2022 10:13 |