The Contracting Authority wants to purchase a M/R station (Measuring & Regulating Station). The station is to be used for pressure reduction of natural gas between the transmission pipeline (80-55 barg) and the distribution pipeline (35-55 barg). The M/R station is part of FTB (Fast track Biogas) project, in which the gas from the distribution line pressurizes and deodorizes the gas to the transmission line. This will enable flow of biogas both ways, making it possible to distribute gas national in Denmark, utilizing the biogas produced locally. The M/R station will reduce pressure from 80 (transmission) to 55 bar (Distribution), going north towards Aalborg. At gas storage Ll. Torup, a pressure reduction will be installed, to enable pigging. For further details concerning the purchase, reference is made to the Tender Documents.
08.08.2023 12:00:00
42000000-6 Industrielle Maschinen
Energinet
Tonne Kjærsvej 65
7000
Fredericia
Dänemark
Profil anzeigen
Anja Lorenzen
https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
Mitteilung | Datum des Versands | |
---|---|---|
Auftragsbekanntmachung - Sektoren (TED (v209)) | 07.07.2023 13:12 | |
Bekanntmachung vergebener Aufträge oder Zuschlagsbekanntmachung – Standardregelung (eForm) | 15.01.2024 09:31 | Ursprüngliche Bekanntmachungsveröffentlichung |