The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 18 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S requires de-sign, procurement and building/installation, testing and commissioning and maintenance of a power supply station. This will be located at Rødbyhavn on Lolland. Energinet.dk will design and construct the connection with the grid to provide the 132 kV pri-mary system (including switchgear, housings and bus bars) under a separate contract. The Tunnel Power Supply (TPS) contract relates to the design, construction and maintenance of the system and the ancillary works. This should be achieved while observing Femern A/S' CSR poli-cies.
17-5-2021 13:00:00
45232221-7 Transformatoronderstation
45317200-4 Elektrische installatiewerkzaamheden voor transformatoren
31151000-9 Statische omvormers
31155000-7 Wisselrichters
31156000-4 Onderbreekbare stroomvoorziening
31214000-9 Schakelapparatuur
31682210-5 Instrumenten- en besturingsuitrusting
45232220-0 Bouwen van verdeelstation
45300000-0 Installatiewerkzaamheden in de bouw
45315300-1 Elektriciteitsvoorzieningsinstallaties
50000000-5 Reparatie- en onderhoudsdiensten
50532000-3 Reparatie en onderhoud van elektrische machines, apparatuur en aanverwante uitrusting
50532200-5 Reparatie en onderhoud van transformatoren
71541000-2 Bouwprojectenbeheer
Femern Bælt A/S
Vester Søgade 10
1601
København V
Denemarken
Femern - Jimmie Bøllingtoft
Type | Publicatiedatum |
---|---|
Aankondiging van een opdracht - Nutssectoren (TED (v209)) | 12-4-2021 13:10 |
Aankondiging van een gegunde opdracht - Nutssectoren (TED (v209)) | 22-12-2022 10:13 |