The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 18 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S requires de-sign, procurement and building/installation, testing and commissioning and maintenance of a power supply station. This will be located at Rødbyhavn on Lolland. Energinet.dk will design and construct the connection with the grid to provide the 132 kV pri-mary system (including switchgear, housings and bus bars) under a separate contract. The Tunnel Power Supply (TPS) contract relates to the design, construction and maintenance of the system and the ancillary works. This should be achieved while observing Femern A/S' CSR poli-cies.
17.5.2021 13.00.00
45232221-7 Muuntamo
45317200-4 Muuntajien sähköasennukset
31151000-9 Staattiset muuttajat
31155000-7 Vaihtosuuntaajat
31156000-4 Keskeytysvarmentamattomat virtalähteet
31214000-9 Kytkinlaitteistot
31682210-5 Instrumentointi ja ohjauslaitteet
45232220-0 Ala-asemien rakennustyöt
45300000-0 Rakennusten asennustyöt
45315300-1 Sähkönjakelulaitteiden asennustyöt
50000000-5 Korjaus- ja huoltopalvelut
50532000-3 Sähkökoneiden ja -laitteiden korjaus ja huolto
50532200-5 Muuntajien korjaus ja huolto
71541000-2 Rakennushankkeen johto
Femern Bælt A/S
Vester Søgade 10
1601
København V
Denmark
Femern - Jimmie Bøllingtoft
| Notice | [DispatchDate] |
|---|---|
| [TedS09F05ContractUtilities] ([TedS09]) | 12.4.2021 13.10 |
| [TedS09F06ContractAwardNoticeUtilities] ([TedS09]) | 22.12.2022 10.13 |