410119 - 410119 Consultancy assistance regarding feasibility study of CCUS

The objective of this study is the technical and economic feasibility of a carbon capture facility for the waste CHP plant owned and operated by Fjernvarme Fyn Affald A/S (FFA). FFA receives approximately 280.000 t/year of mixed waste and consequently the captured CO2 will be a mix of fossil and biogenic CO2. The major part of the biogenic CO2 is assumed to be utilized by Fortum for methanol production to the extent that this is feasible (to be investigated by Fortum in separate study) whereas not utlised CO2 shall be stored permanently.

23.01.2023 13:00:00

71318000-0  Veiledende og rådgivende ingeniørvirksomhet
71600000-4  Teknisk testing, analyse- og rådgivingstjenester
90713000-8  Rådgivningstjenester relatert til miljø


Fjernvarme Fyn
Havnegade 120
5000
Odense C
Danmark

Jette Køhler
https://www.fjernvarmefyn.dk/

Publiserte kunngjøringer
05.Kunngjøring av konkurranse - forsyning (TED (v209)) 06.01.2023 11:27
06. Kontraktstildeling - forsyning (TED (v209)) 25.08.2023 00:12
Delkontrakt
410119 Consultancy assistance regarding feasibility study of CCUS
Tilleggsinformasjon:
Dokumenter Dokumenter
Lukke