Shore Power System in the Port of Aarhus

This contract includes the delivery of a DS/IEC/IEEE 80005 compliant Shore Power System (SPS) in the Port of Aar-hus, Denmark. The SPS supply one ship at a time at a specific berth at Polensgade, Aarhus C. The cruise ship terminal in question can accept ships with a size of up to approx. 300 m LOA. The contract includes: converter station, Medium voltage underground cabling between SPS and connection boxes, mobile cable management device, training of personel etc., see furthermore section II.2.4.

11-1-2021 12:00:00

31200000-8  Distributie- en regelinstallaties voor elektriciteit
45315300-1  Elektriciteitsvoorzieningsinstallaties
45255420-9  Onshoremontagewerkzaamheden
45311000-0  Aanbrengen van elektrische bedrading en fittings
71323100-9  Ontwerpen van elektriciteitssystemen
45317200-4  Elektrische installatiewerkzaamheden voor transformatoren
31682540-7  Uitrusting voor onderstation
51111300-6  Installatie van transformatoren
45311200-2  Aanbrengen van elektrische fittings
51112000-0  Installatie van elektriciteitsdistributie- en -regeluitrusting
51110000-6  Installatie van elektrische uitrusting


Port of Aarhus
Vandvejen 7
8000
Aarhus C
Denemarken

KAPS - Cecilie Hansen

Percelen
Shore Power System in the Port of Aarhus
Inhoud:
Documenten Documenten
Postadres:
Vandvejen 7
8000
Aarhus C
Denemarken
Sluiten