The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 18 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S requires de-sign, procurement and building/installation, testing and commissioning and maintenance of a power supply station. This will be located at Rødbyhavn on Lolland. Energinet.dk will design and construct the connection with the grid to provide the 132 kV pri-mary system (including switchgear, housings and bus bars) under a separate contract. The Tunnel Power Supply (TPS) contract relates to the design, construction and maintenance of the system and the ancillary works. This should be achieved while observing Femern A/S' CSR poli-cies.
17-05-2021 13:00:00
45232221-7 Transformatorstation
45317200-4 Elinstallation til transformere
31151000-9 Statiske omformere
31155000-7 Invertere
31156000-4 Afbrydelige strømforsyninger
31214000-9 Koblingsudstyr
31682210-5 Instrument- og betjeningsudstyr
45232220-0 Anlæg af koblingsstation
45300000-0 Udførelse af bygningsinstallationer
45315300-1 Strømforsyningsinstallationer
50000000-5 Reparations- og vedligeholdelsestjenester
50532000-3 Reparation og vedligeholdelse af elektriske maskiner, apparater og tilhørende udstyr
50532200-5 Reparation og vedligeholdelse af transformatorer
71541000-2 Koordinering af byggeprojekt
Femern Bælt A/S
Vester Søgade 10
1601
København V
Danmark
Femern - Jimmie Bøllingtoft
Bekendtgørelse | Afsendelsesdato |
---|---|
05. Udbudsbekendtgørelse – forsyningsvirksomhed (TED (v209)) | 12-04-2021 13:10 |
06. Bekendtgørelse om indgåede kontrakter – forsyningsvirksomhed (TED (v209)) | 22-12-2022 10:13 |